Annexure A FORM 1 Isee Regulation 3] (ro be submitted at rhe ti*. o?Ri$l:::":r::-li"J:tll,,n r.orect and ror withdrawar of Money from Designated Account) Dare ro, rhe SANJAY SHESHARAO INGLE ^)) lt I Subject: Certificate of Percentage of Comp1etion of Construction work of SHRICHARANHIEGHTS havins MahaRERA Resistration Number P501000091,61, beins developed uv SANJAY SHESHARAO INGLE Sir, l-i we have undertaken assJ-gnment as Architect /Licensed Surveyor of certifying Percentage of completion of construction work of SHRICHARAN HIEGHTS having MahaRERA Registration Number P50100009L6't , being developed uy SANJAY SHESHARAO INGLE Based on Site rnspection, with respect to Layout / each of the euilding/wing of aforesaid Real Lstate project the r certify that as on the date of this certificate, the percentage of work done for each of the buil_ding/Wing of the Real- Estate Project under MahaRERA is as per Table A herein bel-ow. The percentage of the work executed with respect to each of the activity of the entire phase is detail-ed in Tabl-e B. TABLE-A T'aYout / auitoing \wing Number (to be prepared separately for each Layout /Buil-ding /wing of the project) Percentage of work acctual S.no Task/activity done (as on date of certificate) L Excavation L00o/o 2 Basements (if any) L00% 3 Podiums (if any) NA 4 Pl-inth LOOOA 5 Stilt Floor t L00% 6 Sfabs of Super Structure 6Oo/o Internaf wa11s, Internal_ plaster, Floorings, Doors 7 and windows within Fl_ats/premises 40% 8 Sanitary Fittings within the Fl-at/premises 5% Staircases, f .ifts Wel_l_s and f_obbies at each Floor l-evel Overhead and Underground Water Tanks 9 s0% Externa1 plumbing and external plaster, elevation, completion of terraces with waterproofing of the Buitding/ Wing. fnstal-l-ation of Lifts, water pumps, Fire Eighting Fittings and Equipment as per CFO NOC, E1ectrical fittings, mechanical equipment, compfiance to con- ditions of environment/CRz NOC, Finishing to en- trance lobby/s, plinth protection, paving of areas appurtenant to euilding/Wing, Compound Wal-l and al-f other requirements as may be required to com- plete project as per specifications in agreement of Sal-e. Any other activities. TABLE-B Common Areas (Internal and External Development Works) in respect of the Registered ase / roj ect Phase Proposed Percentage of work acctual S.no common area facilities (yes/no) done (as on date of certificate) Details fnternal- Roads & Foot- L paths NO 2 Water Supply YES NIL Sewerage (Chamber, 1ines, 3 Septic Tank, STP). YES NIL 4 Storm Water Drains NO Landscaping & Tree Pl-ant- 5 inq NO 6 Street Lishtine NO 7 Communiw Buildines NO Treatment and disposal of 8 sewage and sul-l-aqe water. NO Solid Waste management & 9 Disposal NO Water conservation / Rain water 10 harvesting NO 7L Energy management NO Fire protection and fi-re safety t2 requirements NO El-ectricaf meter room, 13 sub-stati-on, YES so% receiving station. Others (Option to Add t4 more). ' Yours Faithfully, NO 'ffih lr Signature & Name YASHRAJ INGLE of L.S / Arch M6I Blzte )lm Nrr""-ld fl)/ ) QE.n4 Agreed and Accepted by: SANJAY SHESHARAO INGLE on Signature of Promoter Wr\r1