Annexure A EORM 1 Isee Regulation 3] ARCHITECT I S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal- of Money from Designated Account) Dare ylEl - To, the SANJAY SHESHARAO INGLE Subject: Certificate of Percentage of Completion of Construction Work of SHRICHARAN HIEGHTS havins MahaRERA Resistration Number P501000091,61, beins developed ly SANJAY SHESHARAO INGLE Sir, 1i We have undertaken assi.gnment as Architect /Licensed -curveyor of certifying Percentage of Completion of Construction Work of SHRICHARAN HIEGHTS having MahaRERA Registration NumberP50100009'1,61, being developed ny SANJAYSHESHARAO INGLE Based on Site fnspection, with respect to Layout / each of the euilding/Wing of the aforesaid Re4I Lstate Project I certify that as on the date of this certificate, the Percentage of Work done for each of the buil-ding/Wing of the Real- Estate Project under MahaRERA i-s as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detail-ed in Tabl-e B. TABLE-A Layout / auitding 'Wing Number (to be prepared separately for each Layout /Building /Wing of the Project) Percentage of work acctual S.no Task/activity done (as on date of certificate) 1 Excavation L00% 2 Basements (if any) L00% 3 Podiums (if any) NA 4 Pl-inth 700% 5 Stilt Fl-oor L00% 6 Slabs of Super Structure 40% Interna.l- wal-ls, Internal Pl-aster, Floorings. Doors 7 and windows within Fl-ats/Premises 40% 8 Sanitary Fittings within the FLat/premises 5% Staircases, l-.ifts Wells apd f_obbies at each Floor level Overhead and Underground Water Tanks 9 40% External- plumbing and external- plaster, elevation, completion of terraces with waterproofing of the Building/ Wing. Instal-l-ation of Lifts, Fittings and Equipment as per CEO NOC, Sl_ecirical fittings, mechanical equipment, compliance to con- ditions of environment/CRZ NOC, Finishj_ng to en- trance fobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall_ and all other requirements as may be required to com- plete project as per specifications in agreement of SaIe. Any other activities. TABLE-B Common Areas (rnternal and External- Devel-opment Works) in respect of the Registered Phase / Project Proposed Percentage of work acctual S.no common area facilities (ves/no) done (as on date of cer:tificate) Details Internal- Roads & Foct- 7 paths NO 2 Water Supply YES NIL Sewerage (Chamber, J_ines, 3 Septic Tank, STP). YES NIL 4 Storm Water Drains NO Landscaping & Tree pl_ant- 5 ing NO 6 Street Liehtine NO 7 Community Buildines NO Treatment and disposaL of 8 sewage and sullage water. NO Solid Waste management & I Disposal NO Water conservation / nain water 10 harvesting NO 71 Energy management NO Fire protection and fire safety 72 requirements NO Electrical meter room, 13 sub-station, YES 50% receiving station. Others (Option to Add L4 more). ' NO -a----:\- Yours FaithfuJ-Iy, 4 t/ 8#h