FORM-2 ENGINEER'S CERTIFICATE -2023) Money from Designated Account- Project wise March (To be submitted for withdrawal of Date: 18.05.2023 To Dhariwal and Chhoriya Developers LLP, Satara Road, Adinath Shopping Center, Adinath Society, Pune Chhoriya Realty, Office No 401, 4th Floor Opp Hotel Panchami, Pune 411037. R.M. Dhariwal Cost Incurred for Infrastructural Development Work of Subject: Certificate of Registration Number: Dhariwal Township Akola Plotting having MahaRERA Township - R. M. Chhoriya Developers LLP. P50100017949 being developed by Dhariwal and Sir, R. M. have undertaken assignment of certifying Estimated Cost for 1. |Avinash S. Wadgaonkar P50100017949 Akola Plotting having MahaRERARegistration Number: Dhariwal Township Chhoriya Developers LLP. being developed by Dhariwal and for completion of the Civil, MEP, and allied works required 2. We have estimated the cost of project. Our estimated cost calculations are Development works, Proposed In said Layout of the reference by the available to us for the project under based on the Drawings /plans made entire work as schedule of items and quantity for the developer and consultants and the Surveyor* appointed by Developer/ Engineer, calculated by Mr.Dinesh Y. Moundekar Quantity the labour and other inputs made by developer, and and the assumption of the cost of material, the above analysis given to us. site inspection carried out by us to ascertain/confirm completion of the Infrastructural work in the aforesaid 3. We estimate Total Estimated Cost of Table B) at the time of registration. The project under reference as Rs.1,54,17,300 (Total of MEP and allied works required for estimated Total Cost of project is with reference to the Civil, sale and for the purpose completion of project as per specifications mentioned in agreement of Development from the Amravati Town of obtaining completion certificate for the plotted project is being Planning being the Planning Authority under whose jurisdiction the aforesaid implemented. 1,23,33,840 (Total of Table B). The 4. The Estimated Cost Incurred till date is calculated at Rs. materials/Services used amount of Estimated Cost Incurred is calculated on the basis of input and unit cost of these items. layout, as per 5. The Balance cost of Completion of the Civil, MEP, and Allied works in the 30,83,460 Specifications mentioned in agreement of sale, of the project is estimated at Rs. (Total of Table B). layout, as per 6. Icertify that the Cost of the Civil, & development and allied work for in the Specifications mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table B below: FORM-2 (TABLE B) RM Dharlwal Township (to be prepared for tho entire registered phase of the Real Estate Projoct) Akola Ploting Amount Sr. No Particular Development Works Total Estimated cost of the Internal and External Rs. 15417300 1 including amenities and facilities in the layout |as on 28.09.2018 date of Registration is |Cost incurred as on 30.03.2023 Rs. 12333840 2 (based on the Estimated cost ) % 80% Work done in percentage (As ercentage of the estimated cost) Balance Cost to be Incurred 3083460 Rs. (Based on Estimated Cost) Extra ltems 9181221 Cost Incurred on 30.03.2023 Additional/ Rs. on not included in the Estimated Cost (AnnexureA) 5 as otkar Yours Faithfully Engine Reg.No. 17089/ Avinash S. Wadgaonikara Agreed and Acccpted by, Signature of Promoter Name: Anmol K. Chhoriya * Note 1 The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate/Completion Certificate. 2 (*)Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of find ependent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*)and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked(*). 3 The estimated cost includes all labour, material, equipment and machinery required to carry out entire work. As this is an estimated cost, any deviation in quantity required for development of the Real estate Project willresult in amendment of the cost incurred/to be incurred. 5 Allcomponents of work with specifications are indicative and no texhaustive.