FORM-2 ENGINEER'S CERTIFICATE (To be submitted for withdrawal of Money from Designated Account- Project wise June -2023) Date: 18.07.2023 To Dhariwal and Chhoriya Developers LLP, Chhoriya Realty, Office No 401, 4th Floor Adinath Shopping Center, Adinath Society, Pune Satara Road, Opp Hotel Panchami, Pune 411037. Work of R.M. Dhariwal Subject: Certificate of Cost Incurred for Infrastructural Development MahaRERA Registration Number: Township R. M. Dhariwal Township Akola Plotting having P50100017949 being developed by Dhariwal and Chhoriya Developers LLP. Sir, assignment of certifying Estimated Cost for R. M. 1. |Avinash S. Wadgaonkar have undertaken MahaRERA Registration Number: P50100017949 Dhariwal Township Akola Plotting having Developers LLP. being developed by Dhariwal and Chhoriya completion of the Civil, MEP, and allied works required for 2. We have estimated the cost of calculations are the project. Our estimated cost Development works, Proposed In said Layout of reference by the the Drawings /plans made available to us for the project under based on entire work as and consultants and the schedule of items and quantity for the developer Engineer, Surveyor* appointed by Developer/ calculated by Mr.Dinesh Y. Moundekar Quantity developer, and the material, labour and other inputs made by and the assumption of the cost of ascertain/confirm the above analysis given to us. site inspection carried out by us to the aforesaid Estimated Cost of completion of the Infrastructural work in 3. We estimate Total registration. The of Rs.1,54,17,300 (Total of Table B) at the time project under reference as works required for of project is with reference to the Civil, MEP and allied estimated Total Cost purpose project as per specifications mentioned in agreement of sale and for the completion of the Amravati Town completion certificate for the plotted Development from of obtaining jurisdiction the aforesaid project is being Planning Authority under whose Planning being the implemented. B). The till date is calculated at Rs. 1,23,33,840 (Total of Table 4. The Estimated Cost Incurred materials/Services used calculated on the basis of input amount of Estimated Cost Incurred is and unit cost of these items. layout, as per the Civil, MEP, and Allied works in the 5. The Balance cost of Completion of is estimated at Rs. 30,83,460 Specifications mentioned in agreement of sale, of the project (Total of Table B). for in the layout, as per 6. certify that the Cost of the Civl, & development and allied work date Specifications mentioned in agreement of sale, of the aforesaid Project as completed on the of this certificate is as given in Table B below: FORM-2 (TABLE B) (to be prepared for the entire registered phase of the Real Estate Project) RM Dhariwal Township Akola Plotting Sr. No Particular Amount Total Estimated cost of the Internal and External Development Works including amenities and facilities in the layout as on 28.09.2018 date of Rs. 15417300 Registration is Cost incurred as on 2 30.06.2023 (based on the Estimated cost ) RS. 12333840 |Work done in |(As ercentage percentage of the estimated cost) % 80% 4 Balance Cost to be Incurred (Based on Estimated Cost) Rs. 3083460 5 Cost Incurred on 30.06.2023 Additional/ Extra Items as on not included in the Estimated Cost Rs. 9181221 (AnnexureA) Yours FaithfuBýT Wad Rnging Reg.No. A-17089j AVinash S. Wádaonkat Agreed and Acccpted by, Signature of Promoter Name: Anmol K. Chhoriya * Note 1 The scope of work is to complete entire Real Estate Project as per drawings approved from time to time so as to obtain Occupation Certificate/Completion Certificate. 2 (*)Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of find ependent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*)and in case quantity are being calculated by office of Engineer, the name of the person in the office of Enginer, who is responsible for the quantity calculated should be mentioned at the place marked(*). 3 The estimatedcost includes all labour, material, equipment and machinery required to carry out entire work. 4 As this is an estimated cost, any deviation in quantity required for development of the Real estate Project willresult inamendment of the cost incurred/to be incurred. 5 All components of work with specifications are indicative and no texhaustive.