FORM-2 ENGINEER'S CERTIFICATE (Tobo submittod for withdrawal of Monoy from Dosignatod Account- Projsct wiss Dgc 2022) Dats: 18. 02.2023 To Dhariwal and Chhoriya Developers LLP, Chhoriya Realty, Office No 401, 4th Floor Adinath Shopping Center, Adinath Society, Pune Satara Road, Opp Hotel Panchami, Pune 411037. Subject: Certificate of Cost Incurred for Infrastructural Dovelopment Work of R.M. Dhariwal Township - R. M. Dhariwal Township Akola Plotting having MahaRERA Rogistration Nurmtber: P50100017949 being developed by Dhariwal and Chhoriya Developors LLP. Sir, 1. IAvinash S. Wadgaonkar have undertaken assignment of certifying Estirnated Cost for R. M. Dhariwal Township Akola Plotting having MahaRERA Registration Number P50100017949 beingdeveloped by Dhariwal and Chhoriya Developers LLP. 2. We have estimated the cost of Civil, MEP, and allied works required for cormpletion of the Development works, Proposed In said Layout of the project. Our estimated cost calculations are based on the Drawings /plans made available to us for the project under reference by the developer and consultants and the schedule of items and quantity for the entire work as calculated by Mr.Dinesh Y. Moundekar Quantity Surveyor appointed by Developerl Enginee, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us to ascertainlconfirm the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the Infrastructural work in the aforesaid project under reference as Rs.1,54,17,300 (Total of Table B) at the time of registration. The estimated Total Cost of project is with reference to the Civil, MEP and allied works required for completion of project as per specifications mentioned in agreement of sale and for the purpose of obtaining completion certificate for the plotted Development from the Amravati Town Planning being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs. 1,23,33,840 (Total of Table B). The amount of Estimated Cost Incurred is calculated on the basis of input materials/Services used and unit cost of these items. 5. The Balance cost of Completion of the Civil, MEP, and Allied works in the layout, as per Specifications mentioned in agreement of sale, of the project is estimated at Rs. 30,83,460 (Total of Table B). 6. Icertify that the Cost of the Civil, & development and allied work for in the layout, as per Specifications mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table B below FORM-2 (TABLE B) (to be prepared for the entire registered phase of the Real Estate Project) RM Dhariwal Township Sr. No Akola Plotting Particular Amount |Total Estimated cost of the 1 |iasncluding Internal and External on amenities and facilities in the layout Development Works 28.09.2018 date of Registration is Rs. 15417300 2 Cost incurred as on 30.09.2022 (based on the Estimated cost ) Rs. 12333840 Work done in (As ercentage percentage 3 of the estimated cost) % 80% 4 Balance Cost to be Incurred (Based on Estimated Cost) Rs. 3083460 5 Cost Incurred on 30.09.2022 as on not included in the Additional/ Extra ltems Estimated Cost (AnnexureA) Rs. 9181221 eaonka Yours Faithfully/ Reg.NEo.ngin Avinash S. Wadgashkkr 1a A-17089 Agreed and Acccpted by, Signature of Promoter Name: Anmol K. Chhoriya * Note 1 The scope of work is to complete entire Real from time to time so as to obtain Occupation Estate Project as per drawings approved 2 Certificate/Completion Certificate. (*)Quantity survey can be done by office of Engineer or can be done by an independent Quantityy Surveyor, whose certificate of quantity calculated can Engineer. In case of find ependent quantity surveyor being be reliedby upon by the name has to be mentioned at the place marked appointed Developer, the (*)and in case quantity are being calculated by office of Engineer, the name of the person in the office of responsible for the quantity calculated should be mentioned at the placeEngineer, who is 3 The estimated cost includes all labour, marked(*),. material, equipment and machinery required to carry out entire work. As this is an estimated cost, any deviation in quantity Real estate Project will result in amendment of the costrequired for development of the 5 All components of work with specifications are incurred/to be incurred. indicative and no texhaustive.