SAGAR S. SHAH B.E.(Civil) MLE.,FI.V. Cell 9.22247 125 F -27433 E-na er saqarshahOgmal.com " Approved Valuer " Consulting Engineer 54. Sahajeevan Colony. Visemala. College Road, Nashik 422 005 ENGINEER'S CERTIFICATE (FORM 2) lFor Quarter No. 1of Financial Year 2025-26 Date: 30.06.2025 To, MAULI GROUP Plot No. 9, Amrut Nagar, Jalanmb Road, Khamgaon, District Buldhana - 444303. Subject: Certificate of Cost Incurred for Development of MAULI TOWER having Registration Number P50000078288 being:developed by MAULI GROUP. MahaRERA Sir, 1. I Er. Sagar S. Shah have undertaken assignment of certifying Estimated TOWER having MahaRERA Registration Number P50000078288 beingCost for MAULI MAULI GROUP developed by 2. We have estimated the cost of Civil, MEP and Allied works required for the apartments and proportionate completion of internal & external work of completion of the project as per specifications mentioned in agreement of sale. Our estimated cost based on the Drawings/plans made availabBe to us for the project under calculations are Developer / Consultants. The Schedule of items and quantity required for reference the by the entire work as calculated by :r. Sagar S. Shah Quantity Surveyor appointed by assumption of tlhe cost of material, labour and other inputS made byDeveloper/Engineer, the developer, and the site inspection carried out by us to ascertain/ confirmthe above analysis given to us. 3 We estimate Total Estimated Cost of completion of the aforesaid project under reterence as Rs. 12,00,00,000/- (1n words Rupees Twelve Crores Only) (Tot.al of Table A and B) at the time of Registration. The estimated T'otal Cost of project is with reterence tß the Civil, MIEP and allied works required for completion of the uprments Jnd proportionale c0mpletion of inteTnal & external work, as per specitications mentioned n dpreement of sale and lor the purpose of obtaining occupation cerilicate / certificate for the Building(s) / Wing(s) / layout / Plotted Developnnent completion tron the KHAMGAON MUNICIPAL COUNCIL being the Planning Autthority under whose jurisdclion the aforesaid projectis beingimplemented. GAR S CumaltingSy lfngaeer Apgiqved Yalver VASHI 1. The :stimated Cost Incurred till date is calculatcd at Rs. 5,24,25,000/- (Total of Table A and B). The amount of Estimated Cost Incurrcd is calculatcd on the basis of input matcrials /services uscd and unit cost of these items. 5. The Balance cost of Completion of the Civil, MEP and Allicd works for completion of aparments and proportionate complction of internal &cxternal work as per spccifications mentioned in agreement of sale, of the project is estimated at Rs. 6,75,75,000/- (Total of Table Aand B). 6.lcertify that the Cost of the Civil, MEP and Allied works for apartments and proportionate internal & cxternalwork as per specifications mentioncd in agrecment of sale, of the aforcsaid Projcct as completcd on the date of this certificate is as given in Table A and B below: TABLEA MAULI TOWER Sr. No. Particulars Amounts 1 Total Estimated cost of the Building as on date of Registration is Rs. 11,65,00,000/ 2 Cost incurred as on date of certificate Rs. 5,24,25,000/ 3 Work donc in Pcrcentage (as Percentage of the estimated cost) 45% Balance Cost to be Incurred (Based on Estimated Cost) Rs. 6,40,75,000/ 5 Cost Incurred on Extra Items not includcd in the Estimatcd Cost NIL (Table C) TABLEB MAULI TOWER Internal & External Development Works in Respect of the Registered Phase Sr. No. Particulars Amounts 1 Total Estimated cost of Internal &External Development Works Rs. 35,00,000/ including amenities and Facilities in the layout as on date of |Registration is 2 Cost incurred as on date of certificate NIL. 3 Work done in Percentage (as Percentage of the estimated cost) 0% Balance Cost to be Incurred (Based on Estinmated Cost) Rs. 35,00,000/ Cost Incurred on Additional /Exra Items not included in the NIL. Estimated Cost (Table C) GAGAR * ASHI YoursFaithfully GAR S ClilCosutEnginneerg |Approved Valuer F-27433 ER. SAGARS. SHAH WASHIE Signature of Engineer Agrecd and Accepted by: Jariner Signature of Promoter Name: MAULIGROUP Partner: MR. BiIAGWAN W. BARDE Date: 30.06.2025 * Note: 1. The scopc of work is to complcteRegistercd Rcal EstateProject as per drawings approved from timc to time and as per specifications mentioned in agrccmcnt of sale. 2. All componcnts of work with specifications are indicative and not exhaustive. 3. Pleasespecify if therc are any deviations/ qualifications. Examplc: Any deviations in input material uscd from spccifications in agrccment of salc. TABLE C Listof F:xtra / Additional / Deleted Items considered in Cost (which were not part of thc original Estimate of'TotalCost) Sr. No. List of Extra/ Additional/ Delcted ltems Amount (ln Rs.) NIL NIL,