FORM 1 (See Regulation 3) ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 30-06-2024 To, The Shreyash Realties 101,102 Rajiv Gandhi Town Hall Complex Shivaji Chowk, Pachora, Jalgaon. Subject: Certificate of Percentage of Completion of Construction Work of Krushnaji Arcade having MahaRERA Registration Number P49900055715 being developed by Shreyash Realties Sir, I/We The Designers Collective have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction Work Krushnaji Arcade having MahaRERA Registration Number P49900055715 (only applicable after project registration) being developed by Shreyash Realties. Based on Site Inspection. with respect to Layout / each of the Building/Wing of the aforesaid Real Estate Project. I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Layout/Building/Wing Number at Krushnaji Arcade Situated at S. No 84/2 + 84/3 Pachora Dist. Jalgaon (to be prepared separately for each Layout /Building /Wing of the Project) Percentage of Actual work Sr. Tasks /Activity done (as on the No (2) date of (1) certificate) (3) Page | 1 1 Excavation 100 % 2 Basements (if any) 100 % 3 Podiums (if any) 4 Plinth 100 % 5 Stilt Floor NA 6 Slabs of Super Structure a) Ground Floor b) First Floor 100% 7 Internal walls, Internal Plaster, Floorings, Doors and Windows within Flats/Premises 20% 8 Sanitary Fittings within the Flat/Premises 0% 9 Staircases, Lifts Wells and Lobbies at each Floor level 20% Overhead and Underground Water Tanks 10 The external plumbing and external plaster, elevation, 0% completion of terraces with waterproofing of the Building/Wing, 11 Installation of lifts, water pumps, Fire Fighting Fittings 0% and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of sale. Any other activities TABLE-B Common Areas (Internal & External Development Works) in Respect of the Registered Phase/project number Percentage of Actual Sr. Proposed Work done Common areas and Details No. (Yes/No) (as on the Facilities (2) (5) (1) (3) date of certificate) (4) 1. Internal Roads & Yes 0% Footpaths 2. Water Supply Yes 0% 3. Sewerage (chamber, Yes 0% lines, Septic Tank, STP) 4. Storm Water Drains Yes 0% 5. Landscaping & Tree No - Planting 6. Street Lighting No - 7. Community Buildings No - 8. Treatment and disposal Yes 0% of sewage and sullage water Page | 2 Percentage of Actual Sr. Proposed Work done Common areas and Details No. (Yes/No) (as on the Facilities (2) (5) (1) (3) date of certificate) (4) 9. Solid Waste No 0% management & Disposal 10. Water conservation/ Yes 0% Rain water harvesting 11. Energy management No 0% 12. Fire protection and fire Yes 0% safety requirements 13. Electrical meter room, Yes 0% sub-station receiving station 14. Others (option to add NA - more) For, The Designers Collective (Ar. Sanjay G. Mhalas) Reg.No. CA / 87 / 10988. Agreed and Accepted by: Shreyash Realties Signature of Promoter Name: Sanjaykumar H. Kumavat Date: 30-06-2024 Page | 3