Annexure A FORM 1 Date:29/01/2024 [See Regulation 3] ARCHITECT’S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project & for Withdrawal of Money from Designated Account) ‘Krushnaji Arcade’ S. No. 84/2+84/3, Bhadgaon road, Sambhaji chowk, Pachora,Dist. Jalgaon To, M/s. Shreyash Realties, 101,102, Rajiv Gandhi Town Hall Complex, Shivaji Chowk, Pachora, Dist. Jalgaon. Subject: Certificate of Percentage of Completion of Construction Work of <> having MahaRERA Registration Number ______________ (Only applicable after Project Registration) being Developed by Shreyas Realties Sir, I / We have undertaken assignment as Architect / Licensed Surveyor of Certifying Percentage of Completion of Construction Work of <> having MahaRERA Registration Number ______________ (Only applicable after Project Registration) being Developed by Shreyas Realties, Pachora, Dist. Jalgaon. Based on the Site Inspection, with respect to the Layout / each Building/Wing of the aforesaid Real Estate Project, I certify that as on date of this Certificate, the Percentage of Work Done for each of the Building/Wing of the Real Estate Project under MahaRERA is as per Table-A herein below. The percentage of work executed with respect to each of the activity of entire Phase is detailed in Table-B. TABLE-A Layout / Building / Wing Number __ (to be prepared separately for each Layout/Building/Wing of Project) S. Tasks / Activity Percentage of Actual Work No. Done (As on date of the Certificate) (1) (2) (3) 1. Excavation 100 % 2. Basements (if any) 80 % 3. Podiums (if any) N.A. 4. Plinth 100 % 5. Stilt Floor N.A. 6. Slab of Super Structure (R.C.C. Work) a)Ground floor. 100 % b)First floor. 100 % 7. Internal Walls, Internal Plaster, Floorings, Doors, 0% windows within Flats / Premises 8. Sanitary Fittings within Flats / Premises 0% 9. Staircases, Lift Wells & Lobbies at each Floor Level 30 % Overhead and Underground Water Tanks 10. External Plumbing & External Plaster, Elevation, 0% Completion of Terraces, with waterproofing of the Building / Wing 11. Installation of Lifts, Water Pumps, Fire Fighting Fittings 0% and Equipments as per CFO NOC, Electrical Fittings, Mechanical Equipments, Compliance to conditions of Environment / CRZ NOC, Finishing to Entrance Lobby/s, Plinth Protection, Paving of Areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete Project as per specifications to Agreement of Sale, Any other Activity TABLE-B Common Areas (Internal & External Development Works) in respect of the Registered Phase / Project Number S. Common Areas & Facilities Proposed Percentage of actual Work Details No. (Yes / NO) Done (As on date of Certificate) (1) (2) (3) (4) (5) 1. Internal Roads & Footpaths Yes 0% 2. Water Supply Yes 0% 3. Sewerage (Chamber, Lines, Yes 0% Septic Tank, STP) 4. Strom Water Drains Yes 0% 5. Landscaping & Tree Planting No 0% 6. Street Lighting No 0% 7. Community Buildings No 0% 8. Treatment & Disposal of Sewage Yes 0% and Sullage Water 9. Solid Waste Management & No 0% Disposal 10. Water Conservation / Rain Water Yes 0% Harvesting 11. Energy Management No 0% 12. Fire Protection & Fire Safety Yes 0% requirements 13. Electrical Meter Room, Sub- Yes 0% Station, Receiving Station 14. Others (Option to Add more) N.A 0% Yours faithfully, Signature & Name Architect For The Designers' Collective Partner (Arch.Sanjay Mhalas) License Number (CA/87/10988) Date: 29/01/2024 Agreed &accepted by: (Sanjaykumar H. Kumawat) Signature of Promoter Name: Shreyas Realties Date:29/01/2024