AV CONSULTANTS Mohit A.Patil M.Tech(Struc) Annexure B FORM 2 BE (Civil) A.M.I.E [see Regulation 3] ENGINEER'S CERTIFICATE Consultant (To be submitted at the time of Registration of Ongoing Project and for Structural withdrawal of Money from Designated Account-Project Wise) Designer & Date: Charted Engincer To, Plot No.3Shivram JK Elegance Nagar Jalgaon Jalgaon, MAHARASHTRA,425001 425002 E-mail: Avconsultants86 Subject:Certificate of Cost Incurred for Development of JK Elegance having MahaRERA Registration Number @gmail.com P49900077935 (Only Applicable after project Registartion) being developed by JK Elegance Sir, I/We AV Consultants have of Certifying Estimated Cost for JK Elegance having MahaRERA Registration Number P49900077935 (Only Applicable after project Registration, being developed by JK Elegance We have Estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal& external works of the project as per specifications mentioned in agreements of sale. Our estimated cost calculations are bassd on the drawings/plans made available to us for the project under reference by the Developer / Consulatants. The Scheduleof items and quantity required for the entire work as calculated by Quantity Surveyor appointed by Developer/Engineer, the assumption of the cost of material,labour and other inputs made by developer;and the site inspection carried out by us to ascertain / confirm the above analysis given to us. We estimate Total estimated the Cost of completion of thc aforesaid project under reference at Rs. 278324000.00 (Total of Table A and B) at the time of Registration. The estimated Total Cost oforojectwith reference to the Civil, MEP and Alied works required for completion of the apartments and proportionate completion of internal &external works,as per specifications mentioned in agreements of sale and for thepurpose of the obtaining occupation certificate / completion certificate for the Building(s) Wing(s)/ Layout/Plotted Development from the Jalgaon Municipal Corporation being the Planning Authority under whose jurisidiction the aforesaid project is being implemented. Page 1ofS 4 The estimate Cost incurred till date is calculated of Rs. 107050200.00 ( Total of Table A and B ) Cost incurred is calculated on the basis of imput materials/ services used and unit cost of these items. The amount ofEstimotod 5 The Balance Cost of completion of the Civel, MEP and Allied Complition of internal and external works, asper specification mentionedworks in for completion of the apartments and proportionate agreements of the Project is estimated at Rs 171273800.00 (Total of Table Aand B) 6 Icertify that the Cost of the Civil, MEP and allied works the for the apartments and proportionate ate external works,as per specification mentioned in agreement of internal & sale, of the aforesaid Project as completed on the date of this certificate is as given in Table A and Bbelow: Table-A Building/ Wing /Layout Plotted Development bearing Number :JK Elegance/NA Sr. No. Particulars 1 Total Estimated Cost of the BuildingWing/Layout Amount (In Rs.) Plotted Development as on date of Registration is 275544000.00 Cost incurred as on date of certificate 3 107050200.00 Work done in Percentage (as Percentage of the 4 estimated cost) 38.85 Balance Cost to be Incurred**(Based on Estimated Cost) 5 Cost Incurred on the Additional/Extra items not 168493800.00 included in the Estimated Cost (Table-C) Table B Internal and External Development Works in respect of the Registered Phase Sr. No. Particulars Amount (In Rs.) (1) 1 Total Estimated Cost of the Building/Wing/Layout 2780000.00 Plotted Development as on date of Registration is Cost incurred as on date of certificate Work done in Percentage (as percentage of the estimated cost) 4 Balance Cost to be Incurred**(Based on Estimated Cost) 2780000,00 5 Cost Incurred on the Additional/Extra items not included in the 2.00 Estimated Cost (Tablc -C) Yours Faithfully MOHIT A.PATIL M.Tech.(Structures) License No. STATE/R/2025/APL/18126 AV CONSULTANTS Signature & Name (IN BLOCK LETTERS) with Stamp of Engineer [Not Less than bachelor'sDegree Holder or equivalent as per Scction 2(u) of the Act) Local Authority license no. STATE/R/2025/APL/18126 (if applicable) Date of Certificate: Agreed and Accepted by: JK ELEGANCE PARTNFR Signature of Promoter Name: JK Elegance Date: 1.The scope of work is to complete Registered Real Estate Project as per drawings approved from time time and as per specifications mentioned in agreement of sale. 2..(") Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (") and in case quantitly are being calculated by office of Engineer,the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked ("). 3..(*) Balance Cost to be incurred (4) may vary from Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost, any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred / to be incurred. 4..Allcomponents of work with specifications are indicative and not exhaustive 5..Please specify if there are any deviations / qualifications. Example: Any deviations in input material used from specifications in agreement of sale. TABLEC List of ExtralAdditionalWDeleted Items considered in Cost. (which were not part of the oriainal Estimate of Total Cost)