Annexure- B FORM-2 [See Regulation 3] ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-Project Wise) Date: 04.02.2025 To, M/S. JIDNYASA CONSTRUCTIONS, MR. RAKESH BORSE AT POST CHALISGAON DIST JALGAON APPARTMENT having Subject- Certificate of Cost Incurred for Development of AJINKYATARA MahaRERA Registration Number P49900077344 being developed by MR. RAKESH BORSE (M/S JIDNYASA CONSTRUCTIONS) (Promoter) (As on 31.12.2024) Sir, 1. | have undertaken assignment of certifying Estimated Cost for AJINKYATARA APPARTMENT having MahaRERA Registration Number P49900077344 being developed by MR. RAKESH BORSE (M/S JIDNYASA CONSTRUCTIONS) (Promoter) 2. We have estimated the cost of Civil, MEP and allied works required for completion of the apartments and proportionate completion of internal & external works of the project as per specifications mentioned in agreement of sale. Our estimated cost calculations are based on the drawings/plans made available to us for the project under reference by the Developer / Consultants. The Schedule of items and quantity required for the entire work as calculated by Quantity Surveyor* appointed by Developer/Engineer, the assumption of the cost of material, labour and other inputs made by developer and the site inspection carried out by us to ascertain/confirm the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the aforesaid project under reference at Ks.L,35,Z7,470.00 (Totalof Table Aand B) at the time of Registration. The estimated Total cost or Project is with reference to the Civil, MEP And Alied works required for completion or tne apartments and proportionate completion of nternal & external works, as per specifications mentioned in agreement of sale and for the purpose of obtaining occupation certificate 7 Completion certificate for the Building (s) /Wing (s) /Layout/Plotted Development from the TOWN PLANNING JALGAON being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. Rs.56,31,313.00 (Total of Table A and B). 4. The Estimated Cost Incurred till date is calculated at materials/ services used The amount of Estimated Cost Incurred is calculated on the basis of input and unit cost of these items. completion of the apartments 5. The Balance Cost of Completion of Civil , MEP and Allied works for specifications mentioned in and proportionate completion of internal & external works, as per (Total of Table A and B). agreement of sale, of the project is estimated at Rs.78,96,157.00 for the apartments and proportionate 6. |certify that the Cost of the Civil, MEP and allied work in agreement of sale, of the aforesaid internal & external works, as per specifications mentioned given in Table A and B below: Project as completed on the date of this certificate is as TABLE A Building called AJINKYATARA APPARTMENT Amount (ln Rs.) Sr. No. Particulars 1. Total Estimated Cost of the Building / Wing/ Layout/ Plotted Development as on date of Registration is 1,35,27,470.00 56,31,313.00 2 Cost incurred as on date of Certificate 3. Work done in Percentage (as Percentage of the estimated 41.63% cost) 78,96,157.00 44 Balance Cost to be Incurred** (Based on Estimated Cost) in 5 Cost Incurred on Additional/ Extra ltems not included the EstimatedCost (Table-C) 0.00 TABLE B Internal &External Development Works in Respect of the Registered Phase Sr. No. Particulars Amount (In Rs.) 1. Total Estimated Cost of the Internal and External Development Works including amenities and Facilities 0.00 in the layout as on date of Registration is 2. Cost incurred as on date of Certificate 0.00 3 Work done in Percentage (as Percentage of the estimated cost) 0.00 4 Balance Cost to be Incurred ** (Based on Estimated Cost) 0.00 5. Cost Incurred on Additional/ Extra Items not included in the Estimated Cost (Table-C) 0.00 Yours Faithfully Signature Er. Kosogali Ér. Kishor B.Shingate AgreegeVe hc¢erA: Consulting Engineer Signature of Promnoter. Name: Mr. RAKESH BORSE Date: 04.02.2025 Note: 1 The scope of work is to complete Registered Real Estate Project as per drawing approved from time to time and as per specifications mentioned in agreement of sale. 2. (*)Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity arebeing calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked ("). 3. (**) Balance Cost to (1) be incurred (4) may vary from Difference between Total estimated Cost and Actual Cost cost etc. As this (2) due to deviation in quantity required /escalation of incurred dn estimated cost, any deviation in ouantity reguired for development of the Real EState Project will result in amendment of the cost incurred/ to be incurred. 4. Allcomponents of the work with specifications are indicative and not exhaustive. input D. Piease specify if there are any deviations/ gualifications. Example: Any deviations in material used from specifications in agreement of sale. TABLEC List of Extra/ Additional/Deleted Items Considered in cost Cost) (Which were not parts of the original Estimate of Total Amount (In Rs.) Sr. No. List of Extra/Additional/Deleted Items 1. 2.