Annexure A FORM 1 (See Regulation 3) ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated account) Date: 19.01.2025 To, MR. RAKESH BORSE 18, SWAMI VIVEKANANDA COLONY BHADGAON ROAD, CHALISGAON JALGAON Subject: Certificate of Percentage of Completion of Construction Work of AJINKYATARA APPARTMENT having MahaRERARegistration Number P49900077344 being developed by MR. RAKESH BORSE. Sir, I/We MR.PRASHANT R DESHMUKH have undertaken assignment as Architect /Licensed Suveyor of certifying Percentage of Completion of Construction Work of AJINKYATARA APPARTMENT having: MahaRERA Registration Number P49900077344, being developed by MR. RAKESH BORSE. Based on Site Inspection, with respect to layout /each of the Building/ Wing of the aforesaid Real Estate Project. Icertify that as on the date of this certificate, the Percentage of Work done for each of the building /Wing of the Real Estate Project under MahaRERA 0S as per Table Aherein Below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A Layout / Building / Wing Number AJINKYATARA APPARTMENT Sr. No. Tasks/ Activity Percentage of Actual Work Done (As on date of Certificate) (1) (2) (3) 1 Excavation 100% 2. Basements (if any) NA 3. Podiums (if any) NA 4. Plinth 100% 5. Stilt Floor 100% 6. Slabs of Super Structure 100% 7. Internal walls, Internal Plaster, Floorings,Doors and windows 20% within Flats/premises 8. Sanitary Fittings within the Flat/ Premises 0% 9. Staircase, Lifts Wells and Lobbies at each Floor levelOverhead and 100% Underground Water Tanks 10. External plumbing and external Plaster, elevation, Completion of 30% terraces with waterproofing of the Building/ Wing 11. Installation of Lifts, water pumps, Fire Fighting and Equipment as 0% per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOc, Finishing to entrance lobby/s, plinth protection,paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Anyother activities. TABLE-B Common Areas (Internaland External Development Works) in respect of the Registered Phase/ Project Number Sr. No. Common areas and Proposed Percentage of Details facilities (Yes/No) Actual Work Done (As on date of the Certificate) (1) (3) (5) (2) (4) 1 Internal Roads & No 0% Not Completed by Foothpaths Authority 2. Water Supply Yes 0% To be Obtain from Chalisgaon Municipal Council on Completion of the Project 3. Sewerage (Chamber, lines, Yes 0% Septic tank outlet connect Septic Tank, STP) to the Drainage 4. Strom Water Drains No 0% NA 5. Landscaping &Tree Yes 0% Will be provided after Planting completion of Civil work of the project as per CMC DC rule 6. Street Lighting No 0% NA 7 Community Building No 0% NA 8 Treatment and disposal of No 0% Will be provided only if sewage and sullage water required By CMC de rule 9 Solid Waste management No 0% NA &Disposal 10. Water conservation/ Rain Yes 0% Rain water harvesting near water harvesting bore well 11, Energy management No 0% NA 12. Fire protection and Fire No 0% NA safety requirements 13. Electrical meter room,sub No 0% NA station, receiving station. 14. Others (0ption to Add 0% NA More) Yours Faithfully Name: Ar, Prashant R. Deshmukh (License NoCA/2015/70764) SRAN CASO15/ Age fngoeptedby ARCHKS ECTO764 Name: Mr. Rakesh Borse Date: 19.01.2025