Agreed and accepted by: Signature of promoter Name: Sumeet Prakashchand Mutha Date: - 07/04/2026 Note: 1. The scope of work is to complete registered Real Estate Project as per drawing approved from time to time and as per speciation’s mentioned in agreement of sale. 2. (*) Quantity survey can be done by office of Engineer. In case of independent quantity surveyor whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developers, the name has to be mentioned at the place marked (*) and in case quantity are being calculate by office Engineer. The name of person in the office of Engineer, who is responsible for the quantity calculated should at the place marked (*) 3. (**) Balance cost to be incurred (4) may vary from Difference between Total estimated cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost. Any deviation in quantity required for development of the Real Estate project will result in amendment of the cost incurred / to be incurred. 4. All components of work with specification are indicative and not exhaustive. 5. Please specify if there are any deviations / qualification Example: Any deviations in input material used from specification in agreement of sale. Table C List of Extra / Additional/ Deleted Items considered in Cost (Which was not part of the original Estimate of Total Cost) Sr. No. List of Extra / Additional/ Deleted Items Amount (In Rs.) 1. 2.