FORM-2 ENGINEER’S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- Project wise) Date: 07.01.2025 To, Mr. Sumit Prakashchand Mutha 20/1, Ringroad, Jalgaon-425001. Subject: Certificate of Cost Incurred for Development of “Antariksh” having Maha RERA Registration Number: P49900056200 situated on the Plot bearing S. NO.– 385, Plot No.6+7+8+17+18 Mehrun Shivar, Jalgaon Being developed by Mr. sumit Prakashchand Mutha, Jalgaon. Ref: MahaRERA Registration Number: P49900056200 Sir, 1.I Milind Shyamsundar Rathi have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under Maha RERA, For Construction /Development Of “Antariksh” having Maha RERA Registration Number - P49900056200 Situated on the plot bearing S.No.-385, Plot No.6+7+8+17+18, Mehrun Shivar, Jalgaon Being developed by Mr. Sumit Prakashchand Mutha, Jalgaon . 2.We have estimated the cost of the completion to obtain Occupation Certificate/Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Shri. Milind Rathi quantity Surveyor* appointed by Developer/Engineer, and the assumption of the cost of material, labor and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the afore said project under reference as Rs. 20,00,00,000/- (Rupees Twenty Crores Only) (Total of Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate /completion certificate for the building(s) from the Jalgaon Municipal Corporation being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs. 8,95,80,054/- (Rupees Eight Crore Ninty Five Lakh Eighty Thousand Fifty Four Only) (Total of Table A and B). The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate / Completion Certificate from Jalgaon Municipal Corporation (planning Authority) is estimated at Rs. 11,04,19,946/- (Rupees Eleven Crores Four Lakh Nineteen Thousand Nine Hundred Forty Six Only) ( Total of Table A and B). 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below : TABLE A Sr. No Particulars Amounts 1 Total Estimated cost of as on Rs. 20,00,00,000/- date of Registration is 2 Cost incurred as on 31.12.2024 Rs. 8,95,80,054/- (Based on the estimated cost) 3 Work done in Percentage 44.80% (as Percentage of the estimated cost ) 4 Balance Cost to be Incurred Rs. 11,04,19,946/- (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra Items N.A as on 31.12.2024 not included in the Estimated Cost (Annexure A) Table B Sr. No Particulars Amounts 1 Total Estimated cost of the Internal Rs.1,00,00,000/- And External Development works including Amenities and Facilities in the layout as on date of Registration is 2 Cost incurred as on 31.12.2024 N.A. (based on the Estimated cost ) 3 Work done in Percentage N.A. (as Percentage of the estimated cost ) 4 Balance Cost to be Incurred N.A. (Based on Estimated Cost) 5 Cost Incurred on Additional /Extra Items N.A. as on 31.12.2024 not included in the Estimated Cost (Annexure A) Yours Faithfully, Milind Rathi (License No – M-125145-1) Chartered Engineer