Annexture B
FORM2
(see Regulation 3)
ENGINEER'S CERTIFICATE Money fron
Registration of Ongoing Project and for withdrawal of
of
(To be submitted at the time
Designated Account-Project Wise) Date: (s/oi/202b
To,
SURATNAINFRA LLP
MAHARASHTRA,425001
Jalgaon,
SURATNA having MahaRERA Registration
Certificate of Cost Incurred for Development of SUKRUTI SURATNA INFRA LLP
Subject: Registartion) being developed by
Applicable after project
Number P49900052357 (Only
Sir, SURATNA having MahaRERA Registration
SHREYAS SHAH have of Certifying Estimated Cost for SUKRUTI
IWe SURATNA INFRA LLP)
P49900052357 (Only Applicable after project Registration, being developed by
Number
Civil, MEP and alied works reguired for
completion of the apartments and
Estimated the cost of
2.We have
& external works of the project
as per specifications mentioned in agreements
proportionate completion of internal us for the project under
are bassd on the drawings/plans made available to
of sale. Our estimated cost calculations work as
Developer / Consulatants. The Schedule of items and quantity required for the entire
reference the
by material,labour and
Developer/Engineer, the assumption ofthe cost of
calculated by Quantity Surveyor* appointed by above analysis
inspection carried out by us to ascertain confirm the
/
other inputs made by developer,and the site
given to us.
completion of thc aforesaid project under reference
at Rs. 200000000.00
3. We estimate Total estimated the Cost of to Civil,
(Total of Table and B) at the time of Registration. The
A estimated Total Cost ofproject is with reference thc
apartments and proportionate completion of internal & external
MEP and Allied works required for completion of the
for the purpose of the obtaining occupation
works,as per specifications mentioned in agreements of sale and
Layout /Plotted Development from the Jalgaon
certificate /completion certificate for the Building(s) /Wing(s)/
jurisidiction the aforesaid project is being
Municipal Corporation being the Planning Authority under whose
implemented.
of Table A and B).The amount of
4.The Estimated Cost incured till date is calculated at Rs. 159000000.00 (Total
unit cost of these items.
Estimated Cost incurred is calculated on the basis of input materials/services used and
5. The Balance Cost of Completion of the Civil, MEPand Alied works for completion of the apartments and
ment ef saleofthe
proportionate Complition-ofinternal &nexternalworks, aSpet specification mentione
OFF:- 468 Arihant Plaza, Third Floor Jillha Peth, BahinabaiGarden Square, JALGAON- 425001
Page 1
TEL:- 0257-2233473,7020118705,8275017644 Email:- arihantdevelopers9@gmail.com
of Table A and B)
Project is estimated at Rs 41000000.00 (Total
apártménts and proportionate ate internal &
Civil, MEP and allied wotks fhe for the aforésald Project as completed on the date
6. 1 cetify that the Cost of the of the
mentioned in agreementof ale,
external works.as per specification
as glven in Table airnd B below:
À
of this certificate is
Table-A :A/NA
Development bearing Number Amount (In Rs.)
Building/ Wing /Layout Plotted
Particulars 80000000.00
Sr. No. Building/Wing/Layout
Total Estimated Cost ofasthe
on of Registration is 68000000.00
Plotted Development date
2 Cost incurred as on date of certificate 85.00
Work done in Percentage (as
Percentage of the estimated cost) 12000000.00
3
on Estimated Cost) 3500000.00
Balance Cost to be Incurred** (Based
on the Additional/Extra items not included in the
Cost Incurred (Table-C)
5
Estimated Cost
Building/Wing /Layout Plotted Development
bearing Number :B/NA Amount (In Rs.)
13eyiN,v) Particulars 35000000.00
Sr. No. Building/Wing/Layout
1 Total Estimated Cost ofas the
on date of Registration is
Plotted Development 26500000.00
2 Cost incurred as on date of certificate 75.71
of the estimated cost)
3 Work done in Percentage (as Percentage on Cost)
8500000.00
lncurred**(Based Estimated 1750000.00
Balance Cost to be
4
items not included in the
5 Cost Incurred on the Additional/Extra
Estimated Cost (Table-C)
bearing Number :C/NA
Building/ Wing ILayout Plotted Development Amount (In Rs.)
Particulars 70000000.00
Sr. No. Building/Wing/Layout
1 Total Estimated Cost of the
on date of Registration is
|Plotted Development as 59500000.00
|Cost incurred as on date of certificate 85.00
|Work done in Percentage (as
Percentage of the estimated cost) 10500000.00
on Estimated Cost)
Balance Cost to be Incurred**(Based not included in the
3500000.00
5 |Cost Incurred on the Additional/Extra items
Estimated Cost (Table-C)
Page 2 of 4
rable B
aternal and External Development Works in
respect of the Registored Phase
Sr. No.
(1) Particulars Amount (In Rs.)
1
Total Estimated Cost of the Building/Wing/Layout
|Plotted Development as on date 15000000.00|
of Registration is
2 Cost incurred as on
date of certifcate
3 Work done in Percentage
5000000.00!
(as percentage of the estimated cost) 33.33
4 Balance Cost to be Incurred*"(Based on Estimated Cost) 10000000.00
5 Cost Incurred on the Additional/Extra items not included in the
Estimated Cost (Tablc -C)
Yours Faithfully
SHREYAS SHAH
Signature & Name (IN BLOCK LETTERS) with Stamp of Engineer
[Not Less than bachelor's Degree Holder or equivalent as per Scction 2(u) of the Act]
Local Authority license no. 9 (if applicable)
Date of Certificate:
Agreed and Accepted by:
SURATRAANFRA LLP
Signature of Promoter
Name: SURATNA INFRA LLP
Date:
45oi 26 time to time and as
Registered Real Estate Project as per drawings approved from
1.The scope of work is to complete
per specifications mentioned in agreement of sale.
an independent Quantity Surveyor,whose
of Engineer or can be done by
2.(") Quantity survey can be done by office surveyor Developer, the name has to be mentioned
being appointed by
certificate of In case of independent quantity office of Engineer,the name of the
person in the
() and in case quantity are being calculated
at the place marked at place marked (").
office of Engineer, who is responsible for the
quantity calculated should be mentioned the
Actua!
may vary from Difference between Total estimated Cost (1) and
3.(**) Balance Cost to be incurred (4) / escalation of cost etc. As this is
an estimated cost, any
required
Cost incurred (2) due to deviation in quantity amendment of the cost
Real Estate Project will result in
deviation in quantity required for development of the
incurred / to be incurred.
are indicative and not exhaustive
4.All components of work with specifications
qualifications. Example: Any deviations in input
material used from
5.Please specify if there are any deviations /
specifications in agreement of sale.
Page 3
TABLEC
List of ExtralÀdditional/Deleted
(which were nol ltems considered COSt.
pari of 1he originalEstitmale in
of TOtal Cost
St. No. LIst of ExtralAddltlonälWDeleted
Increase In amenities 1tetris
entire project and taw material costs Amount (ln Rs)
fot the
2 ncreasinglabout cösts from 7500000.00
lke in the rawmaterial cost the date of registtation 7500000.00
dateof registration fot the entire ptoject
fto the 10000000.00