LALIT S. RANE 2950075 M. No: 94222 7719R. JALGAON-425001, PH: (0257) 1 25. Reg.N o.CA/90/1 ARCHITECT 3 LAKSHMIKESHAV ApPT. PRATAP NAGÀR, COA SHOP N0,1&2, @ rm_ailCOM. B m a il: sthapatilalitrane FORM1 CERTIFICATE ARCHITECTS Datc: 01/07/2025 P'artnctsliip Act 1932, havine its princinal ois Shalh As To. registered undef the Indian pnrtner Slhri. Anish Chhabildas LLPa partnership fim hrough its & Dist. Jaleaon The Suratna Inf:a AEZES75701L]represcnted Complcx, Jalgaon, Tal. JALGAON JPan: Ccntre, OpP Shama of business at Residcnt of Cream 56 years, Occupation: Business, called Sukruti Suratna hoeie 425001. Construction Work of Project No, 339/2/1 Ner Certificate of Percentage of Completion of developed by Suratna Infra LLP at Gat Subiect: being Jalgaon-425001 Number P49900052357 Asharam, Pimprala Shivar, MahaRERA Reeistration B:hind Vatika apartment, Sukruti DresmHomes Percentage of Completion of as Architccl of ceriilying Sir, )have undertaken the assignment Numbcr P49900052357 I(Shri. Lalit Rane having: MahaRERA Registration of Sukruti Suratna Construction: Work by Suratna' Infra LLP aforesaid Real Estate Project I certify being developed the Building/Wing of the Real respect to said building/Wing of the said Based on Site Inspcction, with Percentage of Work done for the said certificate, the work executed with that as of the date of this as per Table A' herein below. The percentage of the is Estate Project under MahaRERA Table B. activity of the entire phase is detailed in respect to cach of TABLEA Sukruti Suratna Building- A Percen tage of actual work done (as on date of certificate) Task /Activity Sr. No. (3) (2) (1) 100 1 Excavation 100 2 Basements (if any) NA 3. Podiums (if any) 100 4. Plinth NA 5. Stilt Floor .00 6 Slab of Super Structure 7 Internal walls, Internal Plaster, Floorings, Doors, and Windows within Flat/Premises. 8. Sanitary Fittings within the Flat/ Premises Staircase, Lift, Walls & Lobbies at each floor Overhead and Underground 35 9. Water Tanks. 10 External plumbing and external plaster, elevation, completion of terraces with 50 wáterproofing of the Building/Wirg. Installation of Lifts. Water pumps, Sire Fighting Fittings and Equipment as Per CFO NOC, Electrical fittings, nechanical equipment, compliance to Conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth 11. protection, paving of areas appurter.ant to Building/Wing, Compound Wal and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities.
Sukruti Suratha - Building B Percentage of actual work done (as on date of certificate) Task 7 Activity (3) Sr. No. (2) 100 (1) NA 1. Excavation Bascmcnts (if any) NA 2. 100 3. Podiums (if any) NA 4. Plinth 100 Stilt Floor 5. Slab of Super Structure and Windows within 60 6. walls, Intemal Plaster, Floorings, Doors, 7. Intcmal Flat/Premises. Flat/ Premises Sanitary Fittings within the at each floor Overhead and Underground 25 8. Staircase, Lift, Walls & Lobbies 9. Water Tanks. completion of terraces with 40 external plaster, clevation, External plumbing andBuilding/Wing.: 10. waterproofing of the as pumps, Fire Fighting Fittings and Equipment Installation of Lifts. Waterfittings, mechanical equipment, compliance to Per CFO NOC, Electrical NOC, Finishing to entrance lobby/s, plinth Conditions of environment/CRZ Building/Wing, Compound Wall arcas appurtenant to per protection, paving of projcct as 11. requirements as may be requircd to complete and all1l other in agreement of Sale. Any other activities. specifications Sukruti Suratna . Building -C Percentage of actual work done (as on date of certificate) Task /Activity (3) Sr. No. (2) 100 (1) 1. Excavation 100 2. Basements (if any) NA 3 Podiums (if any) 100 4. Plinth NA 5. Stilt Floor 100 6. Slab of Super Structure 60 Doors, and Windows within 7. Internal walls, Internal Plaster, Floorings, Flat/Premises. 8. Sanitary Fittings within the Flat/ Premises 35 Overhead and Underground 9. Staircase, Lift, Walls & Lobbies at each floor Water Tanks. terraces with 50 10. External plumbing and external plaster, elevation, completion of waterproofing of the Building/Wing. Installation of Lifts. Water pumps. Fire Fighting Fittings and Equipnt lo Per CFO NOC, Electrical fittings, mechanical equipment, connpliance to entrance lobby/s, plinth Conditions of environment/CRZ NOC, Finishing Compound Wall protection, paving of areas appurtenant to Building/Wing, 11, and all other requirements as may be required to complete projcct as per specifications in agreement of Sale. Any other activities.
TABLE B Common Arens (Internl and Etterna Development Works) in respect of the Repistered projeet Percentage Details Pròposed St. No., Common AreAs & facilities (Yes/No) of Actuál work doné (As on dlaté (2) (5) (3) (1) certificate) (4) 20 WILL BE COMPLETEDIN DUE YES 1. Internal Ronds & Footpaths COURSE IF TIME WILL BE COMPL.ETED INDUE YES 10 2 Water Supply COURSE IF TIME 10 WILL BE COMPLETED IN DUE YES 3 Sewerage (Chamber, COURSE IF TIME SIP). Lines, Scptic Tank, YES 10 WILL BE COMPLETED IN DUE Stom WaterDrains COURSE IF TIME 4. WILL BE COMPLETED IN DUE YES Landscaping & Trce Planting COURSE IF TIME WILL BE COMPLETED IN DUE YES COURSE IF TIME 6. Street Lighting WILL BE COMPLETED IN DUE YES 7 Community Buildings COURSE IF TIME 15 WILL BE COMPLETED IN DUE sevwage YES 8. Treatment and disposal of COURSE IF TIME and Sullage Water. WILL BE COMPLETED IN DUE Water conservation/ Rainwater YES 9.. COURSE IF TIME harvesting NA NA 10. Energy management CNO WILL BE COMPLETED IN DUE YES 0 11. Fire protection and fire safety COURSE IF TIMiE requirements WILL BE COMPLETED IN DUE Electrical meter SPACE YES 12. COURSE IF TIME IF ANY WILL BE COMPLETED IN 13. OTHERS DUE COURSE IF TIME Yours Faithfully LALIT S. RANE ARCHITECT Shop No. 2, LaxmiKeshav Ar. LALIT RANE (License Number -CA/90/13125). Appartment, Pratap Nagar, Jalgaon 0257-2226275 CA/90/13125 Agreed and Accepted by: Sigratre of Promoter Name :Mr. Anish C Shah Date :01/07/2025 SURATNAJNERALLP