KIRANS. SONAWANE Consulting Civil Engineer Kiran S. Sonawane & Associates PLANNER &DESIGNER Bhadgaon Road In FrontOf Rotary Hall At:-Chalispaon 424 101.Dist. Jalgaon. Mob.72768 18011 e-mail :kranpati55@.gmail .com FORM 1 ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of ongoing Project And for withdrawal of Money from Designated Account) Date: 14/01/2025 To, Jaynarayan Developers Station Road ,Chalisgaon, Subject: Certificate of Percentage of Completion of Construction Work of SSD Complex having Maha RERA Registration Nunber- P49900050851 Being Developed by JAYNARAYAN DEVELOPERS. Sir, We have undertaken assignment as Architect/ Licensed Surveyor of certifying Percentage of Completion of Construction Work of sSD Complex having MahaRERA Registration Number- P4990005085lBeing Developed by JAYNARAYAN DEVELOPERS. Based on Site Inspection. With respect to Layout / each of the Building/ Wing of the aforesaid Real Estate Project, I/ We Certify that as on the date of this Certificate, the Percentage of Work done for each of the building/ Wing of the real Estate Project Under Maha RERA is as per Table herein below. The Percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE A Layout/ Building/ Wing Number KAvSHALYA HEIGHTS ( to be prepared separately for each Layout/ Building/ Wing of the Project) Percentage of Actual Sr. Tasks/ Activity Work done (As on date No of this Certificate) 1 Excavation 95 % 2 Basements ( if any) 95 % 3 Podiums (if any) NA 4 Plinth 90 % 5 Stilt Floor Nil 6 Slabs of Super Structure 85% KIRAN S. SONAWANE Consulting Civil Engineer Kiran S. Sonawane & Associates PLANNER & DESIGNER Bhadgaon Road In Front Of Rotary Hall At:-Chalisgaon424101.Dist. Jalgaon. Mob.727681801| e-mail :kranpati55@.gmail com Internal walls, Internal 75 % Plaster, Flooring, Doors and windows with in Flats/ Premises Sanitary Fittings with in the Flat/ 00 % Promises Staircases, lifts Wells and Lobbies at 50 % each loor level Overhead and underground Water Tanks 10 External plumbing and external plaster, 00% elevation, completion of terraces with water proofing of the building / wing 11 Installation of Lifts water pumps, Fire 00 % Fighting,Fitting and Equipment as per CFO NOC, Electrical fittings, mechanical equiprment, compliance to conditions of environment/ CRZ NOC. Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building / Wing. Compound Wall and all other requirements as may be required to completed project as per specifications in agreement of Sale. Any other activities. TABLE B Common Areas (Internal and External Development Works) in respect of the Registered Phase/ Project Number Common Areas and Facilities Proposed Percentage Details Sr (Yes /No) of Actual No. Work done (AS on date of this Cetificate) Internal Roads & Footpaths Yes 20% 1 Yes 00 Borwell 2 Water Supply 20% Septic Tank 3 Sewerage (Chamber, lines, Yes Septic, STP) Storm Water Drains Yes 00 6" Pvc Line 4 5 Landscaping & Tree Planning No Yes 00 6 Street Lighting 7 Community Buildings No Treatment and disposal of No sewage and sewerage water. 9 Solid Wastemanagement & No Disposal 10 Water conservation/ Yes rainwater harvesting 11 Energy Management No KIRANS. SONAWANE Consulting Civil Engineer Kiran S. Sonawane& Associates PLANNER &DESIGNER Bhadgaon Road In Front OfRotary Hall A:-Chalisgaon 424101Dist. Jalgaon. Mob.727681801| e-mail :kranpati55a,gmail com 12 Fire protection and £ire No safety requirement 13 Electrical meter room, Yes 50 Substation. Receiving station |14 others (Option to Add more no KIRAN Er. Kiran Shivaji Patil GONAND Reg.No. ADTP./JLG/ 210/2022 D.C.E Takli.Pra.Cha Chalisgaon Tal.Chalisgaon. Reg.No. aVILESNGINES Agreed and accepted by Jaynarayan Developers JaySignature of NarayanDeveloperser Partner Partner Partner Name : Date : 15/10/2024.