FORM 1 ARCHITECT’S CERTIFICATE (To be submi ed at the me of Registra on of Ongoing Project and for withdrawal of Money from Designated Account – Building/Wing wise) To Date:26/01/25 Mr. Kailas Vinayak Kasar, Jalgaon. Subject: Cer cate of Percentage of Comple on of Construc on Work of 1 no. Of Building named “ANVIKA ARCADE” project situated on the plot bearing Final plot no.CTS no. 52A demarcated by its boundaries (la tude and longitude of the end points) 21.0146000, 75.5720044 to the North; 21.0144920, 75.5720544 to the South; 21.0145806, 75.5720866 to the East; 21.0145155, 75.05719763 to the West of Division JALGAON village JALGAON taluka JALGAON District JALGAON PIN 425001. measuring 129.60 SQ.M.. area being developed by MR. Kailas V. Kasar Sir, I Mr. Bhushan Nimbalkar have undertaken assignment as Architect / Licensed Surveyor of cer fying Percentage of Comple on of Construc on Work of the 1 No. of Building consis ng of ( BASEMENT FLOOR, GROUND FLOOR, FIRST FLOOR & SECOND FLOOR) of the “ANVIKA ARCADE” project situated on the plot bearing Final plot CTS NO. 52 A In city of JALGAON village JALGAON taluka JALGAON District JALGAON PIN 425001. admeasuring 129.60 SQ.M.. area being developed by MR. KAILAS V. KASAR 1. Following technical professionals are appointed by Owner / Promoter:- (i) MR. BHUSHAN NIMBALKAR as Architect Based on Site Inspec on, with respect to the Building of the aforesaid Real Estate Project, I cer fy that as on the date of this cer cate, the Percentage of Work done for each of the building of the Real Estate Project as registered vide number P49900050721 under RERA is as per table A herein below. The percentage of the work executed with respect to each of the major ac vity of the Building and Overall Percentage of the work done with respect to each Building is detailed in the Table B. ti ti ti ti fi ti ti ti ti ti ti ti tt fi ti ti ti Table A Sr.No Tasks / Ac vity Percentage 1 Excava on 100% 2 Plinth 100% 3 RCC of Slabs of SuperStructure 100% 4 Masonry/ walls -Completed Till 2 oors 100% 5 Internal Plaster –Completed Till 2 oors 100% 6 ExternalPlaster, eleva on- In progress 100% 7 Flooring within premises 100% 8 Door and Windows to each of the Premises 100% 9 External plumbing down take lines,CP/ Sanitary 100% Fi ng within the Flats / Premises- Electrical Fi ng within the Flats / Premises, 10 Electrical switches and wiring inside apartment 100% 11 Pain ng 100% 12 Staircases, Li s Wells and Lobbies at eachFloor 100% level connec ng Staircases and Li sOverhead and Underground Water Tanks 13 Comple on of terraces with waterproo ng of 100% the Building 17 Electrical ngs to Common Areas, water 100% pumps,electro - mechanical equipment’s 18 Finishing of entrance lobby/s, paving of areas 100% appurtenant to Building, Compound Wall and all other requirements as may be required to obtain Occupa on / Comple on Cer cate ti fi ti ft fl fi ti ti ft tti ti fi ti ti ti ti tti tti fl TABLE – B Internal & External Development Works in Respect of the project S. No. Common Roads and Facili es, Propose Percentage of Details Ameni es d (Yes/ Work done No) 1 Side margin pavement No NA 2 Water Supply YES 100% 3 Sewerage (chamber, sewage YES 100% lines), Storm Water Drains 4 Landscaping & Tree Plan ng NO 0% 5 Common area Ligh ng YES 100% 6 Water conserva on, Rain water YES 100% harves ng 7 Fire protec on and re safety NO 0% requirements 8 Electrical meter room, sub- YES 100% sta on, receiving sta on Yours Faithfully, Mr. Bhushan Nimbalkar Architect (License no CA/2018/93209) ti ti ti fi ti ti ti ti ti ti