Annexu.re A FORM 1 (see Regulation 3) ARCHITECTS CERTIFICATE (To be submitted at the 6me of Registration of Ongoing Project and for withdrawal of Money from Designated Account) (upto dated 3Gsept-20231 Date 31/ 7O/2O23 To, M/s. SAI KRUSHNA ASSOCIATES 55, SHIVRAM NAGAR, JALGAON 425001 Subject: Certificate of Percentage of Completion of Construction Work of "SAl KRUSHANASHA HEIGHT" having MahaRERA. Registration Number P499q)049006 (Only Applicable after project Registration) being developed by SAI KRUSHNA ASSOCIATES. Sir, I / We Hemant J. Nyati have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of "5Al I(RUSHANASHA HEIGHT" having MahaRER.A Registration Number P4990flM9006 (Only Applicable after proiect Registration, being developed by SAI XRUSHNA ASSOCIATES. Base on Site lnspection, with respect to Layout/ each of the BuildinS/Wing Of the aforesaid Real Estate Project. I certify that as on the date of the certificate, the Percentage of Work done for each of the building /wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. TABLE-A Buildin8 / wing / Layout/ Plotted oevelopment bearing Number Plot No.20 or called JK Pride (to be for each Buildi Plotted ment of the Real Estate Pro Sr. No Ta ke/Activity Percentage of Actual Work (1) (2\ Done (As on date of the Certificate) (3) 1, Excavatio n lOOo/o 2 Basements (if any) NA 3 NA Podium (if any) 4 100% Plinth 5. Stilt Floor NA 6 Sla bs of Super Structure 1-00% 7 lnternal Walls, lnternal Plaster, Floorings, Doors L00% and wlndows within Flats/Premises. 8 Sanitary Fitting within the Flat /Premises 60% 9 Staircase, Lifts Wells and Lobbies at each Floor 100% level Overhead and Underground Water Tanks 10. Externals plumbing and external plaster, 60% elevation, completion of terraces with waterproofing of the Building/wing 11 lnstallation of Lifts, water pumps, Fire Fighting 40% Fitting and Equipment as per CFO NOC, Electrical fitting. mechanical equipment, compliance to conditions of environment/CRZ NOC, finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirement as may be required to complete proiect as per specifications in agreement of Sale. Any other activities. TABLE-B Common Areas (lnternal and External Development Works) in respect of the Registered Phase/ Project Sr. No Common areas and Facilities Proposed PercentaBe of Actual Details (2',t (Yes/No) Work Done (As on (s) (1) (3) date of the Certificate) (4) 1. lnternal Roads & Footpaths NO NA 2 Water Su pply NO NA 3 Sewerage (Chamber, Lines, Septlc Tank, YE5 40% STP). 4. Storm Water Dra ins NO NA 5 La ndscaping & Tree Planting NO NA 6 Street Lighting NO NA 7 Community Build ings NO NA 8 Treatment and disposal of sewage and NO NA su llage water 9 Solid waste management & Disposal NO NA 10 Water conservation / Rain water NO NA harvesting 11 E nergy ma nagement NO NA L2 Fire protection and fire safety requirement NO NA 13 Electrical meter Toom, sub-station, NO NA receiving station. L4 Others (Option to Add more) NO NA ,w,^_ License No. 16 Agreed and Accepted by: i-; c tuiAhtT -.,. !\tYATi Jalga rn City [4unicipal Corporation 4