Annexure A FORM 1 (see Regulation 3) ARCHITECI'S CERTIFICATE (To be submitted at the lme of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date 3!/07 /2023 To, M/s. SAI KRUSHNA ASSOCIATES 55, SHTVRAM NAGAR,IATGAON -425001 Subject: Cerrificate of Percentage of Completion of Construction Work of "SAl KRUSHANASHA HEIGHT" having MahaRERA. Registration Number P499fiXN9006 (Only Applicable after project Registration) being developed by SAI KRUSHNA ASSOCIATES. Sir, I / We Hemant .1. Nyati have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of Completion of Construction Work of "SAl KRUSHANASHA HEIGHT" having N.4ahaRERA Registration Number P49900049006 (Only Applicable after project Registration, being developed by SAI KRUSHNA ASSOCIATES. Base on Sate lnspection, with respect to Layout/ each of the Building/Wing Of the aforesaid Real Estate Project. I certify that as on the date of the certificate, the Percentage of Work done for each of the building /Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The Percentage of the work executed with respect to each of the activaty of the entire phase is detailed in Table B. TABLE-A Building / Wing / Layout/ Plotted Development bearing Numb€r Plot No.20 or called JX Pride be red for each Buildi Ploned Development of the Real Estate Project) Sr. No. Ta ke/Activity Percentage of Actual work (1) (21 Done (As on date of the Certificate) (3) 1 Excavation 1_00yo 2. Basements (if any) NA 3 NA Podium (if any) 4. 1_00yo P lint h 5 Stilt Floor L00% 6 Slabs of Super Structu re 60% 7 lnternal Walls, lnternal Plaster, Floorings, Doors 40% and windows within Flats/Premises. 8 Sanitary Fitting within the Flat /Premises NA 9 Staircase, Lifts Wells and Lobbies at each Floor level 60% Overhead and Underground Water Tanks 10 Externals plumbing and external plaster, elevation, NA completion of terraces with waterproofing of the Building/Wing 11 Installation of Lifts, water pumps, Fire Fighting NA Fitting and Equipment as per CFO NOC, Electrical fitting. mechanical equipment, compliance to conditions of environment/CRz NOC, finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirement as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE.B Common Areas (lnternal and External Development Works) in respect of the Registered Phase/ Project Sr. No Common areas and Facilities Proposed Percentage of Actual Details (21 (Yes/No) Work Done (As on (s) (1) (3) date of the Certificate) (4) 1 lnternal Roads & Footpaths NA 2 Water Supply NA 3 Sewerage (Chamber, Lines, Septic Tank, 404/a STP). 4 Storm Water Drains 5 La ndscaping & Tree Planting NA 6 Street Lighting NA 7 Community Bu ild ings NA 8 Treatment and disposal of sewage and NA sullage water 9 Solid waste management & Disposal NA 10 Water conservation / Rain water harvesting 1,1 Energy management L2. Fire protection and fire safety requirement NA 13. Electrical meter room, sub-station, receiving station. 14. Others {Option to Add more) *",^-, License No. 16 Agreed and Accepted by: HEMANT J.NYATI Jrlgaon Cify Municpal Copondon TXGINEER L.No.I6 Signature of Promoter 7,f6TIN PETH,JALGAox Name: Archana Jitendra Lathi Mob.!)a222 79875 Date: 3L/07 /2023 A