ALOK JAKHOTIYA ARCHITECT ARCHITECTURE JAKHOTIYA INTERIORS ASSOCIATES PROJECT MANAGEMENT Form-2 ENGINEER'SCERTIFICATE Date: 31/01/2022 To, M/s JAMUNA INFRA, 7 shree shahu nagar, Datta colony, Near bholenath mandir, Jalgaon 425001. Subject: Certificate of Cost Incurred for construction of construction work of 01 building of the project JAMUNA RESIDENCY being developed by M/s Jamuna infra. , Ar.Alok Jakhotiya have undertaken assignment as an engineer of certifying estimated cost for the subject Real Estate Project proposed to be registered under RERA, being 01 building of the project 'JAMUNA RESIDENCY situated on the Plot no 36,37,38 Survey No. 48/6 Biba nagar savkheda, Taluka. Demarcated by its boundaries (Latitude and Longitude of the end points) 21.011788, 75.518882 to the North, 21.012552, 75.518681 to the South, 21.012420, 75.518465 to the East, 21.012372, 75.519150 to the West of Division Jalgaon, Village Jalgaon, Taluka-Jalgaon, Dist- Jalgaon, PIN-425001. Admeasuring 788.66 sq.mtrs area being developed by M/s. Jamuna Infra. 1) Following Technical Professionals are appointed by Owner/ Promoter. Mr. Alok A Jakhotiya as an 'Architect' M/s AV Consultant as 'Structural Consultant' CA Haresh Lokchandani as Chartered Accountant 2) Ihave estimated the cost of completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the building of the project. Our estimated cost calculations are based on the Drawings/ plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated and the assumptions of the cost of the material, labour and other inputs made by Developer, and the site inspection carried by us. +91 88 888 30 321 ar.alokjakhotiya@gmail.com 3) We estimate Total Estimated Cost of completion of the building (s) of the aforesaia project under reference as Rs.1.2 Crores. The estimated Total Cost of the project is wi reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate/ completion certificate for the building(s) from the Town Planning Jalgaon being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4) The Estimated Cost Incurred till the date 30/01/2022 is calculated as Rs. 0.55 Crores. The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cos of 5) The Balance cost of Completion of the Civil, MEP and Allied works of the building(s) the subject project to obtain Occupation Certificate/ Completion Certificate from Town Rs.0.75 Crores Planning-Jalgaon (planning authority) is estimated at I certify that the cost of the Civil, MEP and allied work for the aforesaid project as 6) below. completed on the date of this certificate is as given in Table A and B TableA Sr. No. Particulars Amounts (Rs.)| Total estimated cost of the project as on date of registration 1 1.20 Crores (31/01/2022). 2 Cost incurred as on 31/01/2022 (based on the estimated cost) 0.55 Crores 3 Work done in percentage (as percentage of the estimated cost) 46% Balance cost to be incurred (based on estimated cost) 0.75 Crores 5 Cost incurred on Additional/ Extra Items as on 31/01/2022 not 0.00 included ir the estimated cost (Annexure A) Table B Sr. No. Particulars Amounts (Rs.) Total estimated cost of the Internal and External Development 1 Works including amenities and Facilities in the layout as on date NIL of Registration (31/01/2022) 2 Cost incurred as on 31/01/2022 (based on the estimated cost) NIL 3 Work done in percentage (as percentage of the estimated cost) NIL Balance cost to be incurred (based on estimated cost) NIL Cost incurred on Additional / Extra Items as on 31/01/2022 not induded in the estimated cost 0.00 Yours faithfully, ALOK A. JAKHOTIYA ASSOCIATES JAKHOTIYA JAKHOTIYA Architect: Alok (B.ARCH) Jakhoth a "g.No.CA/2017/82036 ASSOCIATES (Reg.No.CA/2017/82036) Proprietor