A JAKHOTIYA ASSOCIATES FORM1 ALOK JAKHOTIYA ARCHITECT ARCHITECTURE INTERIORS PROJECT MANAGEMENT Date: 31/01/2022 ARCHITECT'S CERTIFICATE To, M/s. Jamuna Infra, 7, Shree, Shahu Nagar, Datta colony, Near Bholenath Mandi Jalgaon -425001. Subject: Certificate of percentage of completion of construction work of the Project Jamuna Residency, situated on the Plot no36, 37,38Gat No. 48/6, Biba Nagar Savkheda, demarcated by its boundaries (Latitude and Longitude of the end points) 21.011788, 75.518882 to the North, 21.012552, 75.518681 to the South, 21.012420, 75.518465 to the East, 21.012372, 75.519150 to the West of Division Jalgaon, Village Jalgaon, Taluka- Jalgaon, Dist-Jalgaon, PIN-425001. Admeasuring 788.66 sq.mtrs area being developed by M/s. Jamuna Infra. Sir, I Ar. Alok A. Jakhotiya have undertaken assignment as an Architect of certifying percentageof completion of construction work of 01 buildings, of the project JAMUNA RESIDENCY situated at the Plot no 36,37,38 Gat No. 48/6,8iba Nagar Savkheda, as per layout plot area 632.16 Sq. Mtr. being developed by M/s Jamuna Infra. 1) Following Technical Professionals are appointed by Owner / Promoter. i) Mr. Aluk Jakhotiya as 'Architect i) M/s AV consultant as 'Structural Consultant' i) CAH sh Lokchandani as 'Chartered Accountant Based on site inspection, with respect to building of the aforesaid Real Estate project, I certify that as on the date of this certificate, the percentage of work done for the building of the Real Estate Project to be registered under Maha RERA is as per Table a herein below. The percentage of the work executed with respect to each of the major activity of the building and overall percentage of work done with respect to building is detailed in the Table A. +91 88 888 30 321 qr.alokjokhotiya@gmail.com ALOK JAKHOTIYA ARCHITECT ARCHITECTURE JAKHOTIYA INTERIORS ASSOCIATES PROJECT MANAGEMENT Table A Sr. Tasks/Activity Percentage of No. work done 1 Excavation 100% 2 1 Number of Plinth 100% O number of Podiums N.A 4 O number of Stilt Floor N.A. 2 number of Siabs of Super Structure 50% 6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and 60% Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical Fittings within the 0% Flat/Premises 8 Staircases, and Overhead and Underground Water Tanks. 50% The external plumbing and external plaster, elevation, completion of 0% terraces with waterproofing of the Building/Wing 10 Installation of water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing 0% to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate +91 88 888 30 321 ar.alokjakhotiya@gmail.com ALOK JAKHOTIYA ARCHITECT A JAKHOTIYA ARCHITECTURE INTERIORS ASSOCIATES PROJECT MANAGEMENT TABLEB Internal & External Development Work in respect of Entire Registered Phase Sr. Common areas and Facilities, ProposedPercentage Details No. Amenities (Yes/No) of work done Roads are to be built by Savkheda Internal Roads &Footpaths: No Gramphachayat. Water has been provided using bore well as well as water connection Water Supply: Yes 50% from Amrut Yojna will be provided bySavkheda Gram panchayat. 3 Sewerage (Chamber, Lines, Underground Tank and chambers Yes 50% Septic Tank, STP): have been prepared. 4 Storm Water Drains: No Not Applicable 5 Landscaping & Tree Planting: No Not Applicable 6 Street Lighting: No Not Applicable 7 Community Buildings: No Not Applicable Treatment And Disposal Of No Not Applicable Sewage And Sullage Water: Solid Waste Management No Not Applicable And Disposal: 10 Water Conservation, Rain Rain Water Harvesting would be Yes 0% water Harvesting: done. Energy management: No 0% Not Applicable 12 Fire Protection And Fire No 0% Not Applicable Safety Requirements: 13 MSEB meters will be installed by buyers after purchase; common Electrical Meter Room, Sub- Yes 0% meter room will be installed in Station, Receiving Station: parking at the time of completion of project. 14 Aggregate area of Overhead water tank, are proposed No 0% recreational Open Space: bythe builder. JAKHOTIYA ASSOCIATES Yours faithfully, Jakhotiya Associates Alaeht Architect: Alok Jakhotiya (Reg.No.A/2017/82036) ALOK A.JAKHOTIYA (B.ARCH) Reg.No.CA/2017/82036 6+91 88 888 30 321 ar.alokjakhotiya@gmail.com