FORM-2 ENGINEER'S CERTIFICATE (To be submitted for withdrawal of Money from Designated Account- Project wise-June-2023) Date: 16.05.2023 To AnmolChhoriya &Associates, Chhoriya Realty, Ofice No 401, 4th Floor Adinath Shopping Center, Adinath Society, Pune Satara Road, Opp Hotel Panchami, Pune 411037. Subject: Certificate of Cost Incurred for Infrastructural Development Work of Chhoriya Fortune city - Parola Plotting having MahaRERA Registration Number: P49900045424 being developed by Anmol Chhoriya &Associates. Sir, for 1. Avinash S. Wadgaonnkar have undertaken assignment of certifying Estimated Cost Chhoriya Fortune city - Parola Plotting having MahaRERA Registration Number. P49900045424 being developed by Anmol Chhoriya &Associates. 2. We have estimated the cost of Civil, MEP, and allied works required for completion of the calculations are Development works, Proposed In said Layout of the project. Our estimated cost based on the Drawings Iplans made available to us for the project under reference by the entire work as developer and consultants and the schedule of items and quantity for the calculated by Mr.Dinesh Y. Moundekar Quantity Surveyor* appointed by Developer/ Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us to ascertain/confirm the above analysis given to us. 3. We estimate Total Estimated Cost of completion of the Infrastructural work in the aforesaid The project under reference as Rs 2,06,29,652(Total of Table B) at the time of registration. estimated Total Cost of project is with reference to the Civil, MEP and allied works reguired for completion of project as per specifications mentioned in agreement of sale and for the purpose of Planning obtaining completion certificate for the plotted Development from the Jalgoan Town implemented. beingthe Planning Authority under whose jurisdictionthe aforesaid project is being The 4. The Estimated Cost Incurred till date is calculated at Rs. 2,06,29,652 (Total of Table B). materials/Services used amount of Estimated Cost Incurred is calculated on the basis of input and unit cost of these items. the layout, as per 5. The Balance cost of Completion of the Civil, MEP, and Allied works in of Specifications mentioned in agreement of sale, of the project is estimated at Rs 0/- (Total Table B). 6. Icertify that the Cost of the Civil, & development and allied work for in the layout, as per Specifications mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in Table B below: FORM-2 (TABLE B) City- Parola Estate Chhorlya Fortune entire registered phase of the Real Plotting (to be prepared for the Project) Amount Sr. Particular No Internal and External 20629652 Total Estimated cost of the and facilities in Rs. 1 Development Works including amenities Registration is 18.05.2022 the layout. Date of 20629652 30.06.2023 RS. Cost incurred as on 2 (based on the Estimated cost ) 100% % Work done in percentage 3 estimated cost) (As ercentage of the 0 Rs. Balance Cost to be Incurred (Based on Estimated Cost) Items 30.06.2023 Additional/ Extra Rs. Cost Incurred on (AnnexureA) 5 the Estimated Cost ason not included in Yours Faithfyar Engine Reg.No. A-17089 Avinash S.Wadbaonkar by Agreed and AcccptedHORIYA AND Signature of Promoter Name: Anmol K. Chhoriya * Note drawings approved from time of work is to complete entire Real Estate Project as per The scope Certificate. OcCupation Certificate/Completion 1 to time so as to obtain independent Quantity of Engineer or can be done by an 2 (*)Quantity survey can be done by officecalculated can be relied upon by the Engineer. In case of Surveyor, whose certificate of quantity appointed by Developer, the name has to be mentioned at being of find ependent quantity surveyor quantity are being calculated by office of Engineer, the name the place marked (*)and in case quantity calculated should be Engineer, who is responsible for the the person in the office of mentioned at the place marked(*). required to carry out estimated cost includes all labour, material, equipment and machinery The entire work. development of the Real is an estimated cost, any deviation in quantity required for As this of the cost incurred/to be incurred. 4 estate Project will result in amendment specifications are indicative and no texhaustive. 5 All components of work with