FORM-2 ENGINEER'S CERTIFICATE wise-March-2023) Money from Designated Account- Project (To be submitted for withdrawal of Date: 16.02.2023 To Associates, Satara AnmolChhoriya & Shopping Center, Adinath Society, Pune 401, 4th Floor Adinath Chhoriya Realty, Office No Panchami,Pune 411037. Road,Opp Hotel Fortune Development Work of Chhoriya Infrastructural Cost Incurred for being developed Subject: Certificate of Registration Number: P49900045424 having MahaRERA city - Parola Plotting Associates. byAnmol Chhoriya & Estimated Cost for Sir, undertaken assignment of cetifying Wadgaonnkar have MahaRERA Registration Number: 1. | Avinash S. having Chhoriya Fortune city Parola Plotting Associates. Anmol Chhoriya & P49900045424 being developed by completion of the works required for MEP, and allied estimated the cost of Civil, estimated cost calculations are 2. We have of the project. Our said Layout Development works, Proposed In project under reference by the plans made available to us for the based on the Drawings for the entire work as quantity the schedule of items and developer and consultants and appointed by Developer/ Engineer, Quantity Surveyor* calculated by Mr.Dinesh Y. Moundekar developer, and the material, labour and other inputs made by cost of and the assumption of the above analysis given to us. inspection carried out by us to ascertain/confirm the site work in the aforesaid Estimated Cost of completion of the Infrastructural 3. We estimate Total B) at the time of registration. The 2,06,29,652_(Total of Table project under reference as Rs works required for reference to the Civil, MEP and allied estimated Total Cost of project is with purpose of project as per specifications mentioned in agreement of sale and for the completion of Planning Development from the Jalgoan Town obtainingcompletion certificate for the plotted jurisdiction the aforesaid project is being implemented. being the Planning Authority under whose (Total of Table B). The date is calculated at Rs. 1,54,72,239 4. The Estimated Cost Incurred till materials/Services used calculated on the basis of input amount of Estimated Cost Incurred is and unitcost of these items. as per the Civil, MEP, and Allied works in the layout, 5. The Balance cost of Completion of project is estimated at Rs 51,57,413(Total Specifications mentioned in agreement of sale, of the of Table B). development and allied work for in the layout, as per 6. | certify that the Cost of the Civil, & aforesaid Project as completed on the Specifications mentioned in agreement of sale, of the date of this certificate is as given in Table B below: FORM-2 (TABLE B) phase of the Real Estate Chhoriya Fortune City- Parola prepared for the entire registered Plotting (tobe Project) Amount Sr. Particular No Internal and External Total Estimated cost of the Rs. 20629652 and facilities in Development Works including amenities Registration is 18.05.2022 the layout. Date of 15472239 Cost incurred as on 30.03.2023 |Rs. 2 (based on the Estimated cost) % 75% Work done in percentage (As ercentage of the estimated cost) 5157413 Balance Cost to be Incurred Rs. 4 (Based on Estimated Cost) Additional/ Extra Items Cost Incurred on 30.03.2023 Rs. 5 Estimated Cost (AnnexureA) as on not included in the Yours Faithfully Wada Kar Gngine Reg.No. A-17089 Avinash S. WadaacAka Agreed and Acccpted MORIYA by, AN Signature of Promoter Name: Anmol K. Chhoriya * Note Project as per drawings approved from time 1 The scope of work is to complete entire Real Estate Certificate. Certificate/Completion to time soas to obtain OcCupation done by an independent Quantity 2 (*)Quantity survey can be done by office of Engineer or can be relied upon by the Engineer. In case of Surveyor, whose certificate of quantity calculated can be Developer, the name has to be mentioned at find ependent quantity surveyor being appointed by office of Engineer, the name of the place marked (*)and in case quantity are being calculated by calculated should be quantity the person in the office of Engineer, who is responsible for the mentioned at the place marked(*). required to carry out The estimated cost includes all labour, material, equipment and machinery entire work. development of the Real 4 As this is an estimated cost, any deviation in quantity required for estate Project will result in amendment of the cost incurred/to be incurred. 5 All components of work with specifications are indicative and no texhaustive.