FORM NO 2.docx - Google Docs ~ 7:29PM SHREYAS ANISH SHAH B.E.(Clvll), PGPFMB Mobile 9552306999 E.mall : shreyash.shaha0gmall.com FORMNO.02 ENGINEER'S CERTIFICATE Date: I5/q3/2023 To, The Arihant Developers, 468, Arihant Plaza, Bahinabai Garden Square, Jillha Peth Jalgaon-425001 Subject: Certificate of Cost lncu1Ted for Development of "SUKRUTI SERENITY" al Gat/Survey No 408+409 (part), Plot No 20, Near Mehrun Lake situated at Mehrun Shivar Tai. Jalgaon, District Jalgaon-425001 having MahaRERA Registration Number P49900032651 developed by ARIHANT DEVELOPERS Sir, 1(Shreyas Shah) have undertaken the assignment of certifying Estimated Cost for "SUKRUTI SERENITY" at 1. Gat/Survey No 408+409 (part), Plot No 20, Near Mehrun Lake situated at Mehrun Shivar Tat. Jalgaon, District Jatgaon-425001 City having. MahaRERA Registration Number P49900032651 developed by ARIHANT DEVELOPERS. We have estimated the cost of Civil, MEP and allied works required for completion of the apartments 2. and proportionate completion of internal & external works of the project as per specifications mentioned in agreement of sale. Our estimated cost calculations are based on the drawings/plans made available to us for the project under reference by the Developer/ Consultants. The Schedule of items and quantity required for the entire work as Calculated by MIS Shreyas Shah Quantity Surveyor* appointed by the Developer, the assumption of the cost of material, labor and other inputs made by the developer, and 1he site inspection carried out by us 10 ascertain/ confirm the above analysis given to us. We estimate the Total Estimated Cost of completion of the aforesaid project under reference at Rs. 3. 7,50,00,000/- (Total of Table A and B) at the time of Registration. The estimated Total Cost of project is with reference to the Civil, MEP and Allied works required for completion of the apartments and proportiona1c completion of internal & external works, as per specifications mentioned in agreement of sale and for the purpose of obtaining occupation certificate/ completion certificate for the Building from the Municipal Corporation of Jalgaon being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. The Estimated Cost Incurred till date is calculated at Rs. 4,00,00,000/- (Total ofTahlc A and B) Th e 4. amount of Estimated Cost lncun-ed is calculated on the basis of input materials /serv ices used and unit cost The of these Cost Balance items.of Co1J1pletion of the Civil, MEP and Allied works for completion of the apartments 5. and proportionate completion of internal & external works, as per specifications mentioned in agreement of sale, of The Project is estimated at Rs. 3,50,00,000/ (Total ofTable A and B). I certify that the Cost of the Civil, MEP and allied work tier the apaitments and proportionate internal & 6. external works, as per specifications mentioned in agreement of sale, of the aforesaid Project as completed on the date of this certificate is as given in 'Table A and B below: TABLE A Sukruli Serenity Amount (in Particulars Rs.) Sr. 7,00,00,000/- No. Total Estimated Cost of the Building/Wing / Layout Plotted Develop111ent as on date of 1. Registration is 4,00,00,000/- Cost incurred as on date of certificate 2. OFFICE: 468 Mobile Arihant Plaza 7020118705, Bahlnaba· 8275017644 E1 Ga;,~enlShquare, Jlllha Peth, Jalgaon 425001 Tel. 0257-2233473 .ma • ar antdevelopers9@gmall.com 1/3 hltpsJ/doCS.google.com/documenVd/1 n6AvmtDyEYwEwEOI-P2M6iXc1 fT3GOY G/edit FORM NO 2 .docx _ Google Ooes 1.z9 ptv1 57.14% l J,00,00,000/- l ( Work done in Percentage (as Percentage of the estimated cost) -3. ....... - s. 4. Balance Cost to he Incu1TCd** (Based on Estimated Cost) Cost IncuITed on Additional/Extra Items not included in the Estimated Cost I Of- I (Table-C) TABLEB Re1nstere d Ph ase Internal & External Develoomeot Works in Resoect oft 1e Particulars I Amount Rs.) (in Sr. so,00,0001- No, Internal and External l. Total Estimated Cost of the Development Works including amen ities and Facilities in the layout as on date of 01- Registration is 0% Cost incurred as on date of certificate 2. so.00,0001- Work done in Percentage (as Percentage of the estimated cost) 3. 0/- Balance Cost to be Incurred** (Based on Estimated Cost) 4. Cost Jncuned on Additional/Extra Items not included in th e Estim ated Cost (Tab le 5. CJ MIS SHREYAS SHAH B.E Civil (University of Pune) Agreed and Accepted by: S, re of Promoter Name: Mr.A nish.C.Sha h Date: 15/03/2023 ~ . The sco pe of work is to complete the Regi stered Real Esta te Project OS per draw in gs appro ved from time to ti me and as per No le: 2. speci li ca tiCost Balance ons to he mentioned in may agreement incurred. vary of sa le. from Difference between Toto I es tim ated CoSI ( \) and J\ cn1 al Cost incurred ( 2) du e to de viation in quantity required / escalation of cost etc. As this is an estimated cos t. any de viau on in quantity requi red for dc vc lopmcnt of the Real Es tate Project will result in amendment of the cost incurred / to be incurred. 3. All components of work with specifications are indicative and not exhaustive. 4. Please specify if there arc any deviations/ qua lifications. Example: Any deviations in input material used from Specifications in agreement of sale. TABLE C List of Extra/ Additional/ Deleted Items considered in Cost /Which were not nart of the ori ginal Estimate of Total Cost) Amount (in List of Extra/Additional/Detected Sr. Rs.) items No. 0 ). NA NA 0 2. 2/3 httpsJ/docs.google.co m/docume nUd/ 1 n6A vmtDyEYwE wEO1-P2M6 iXc 1fT3 GOY G/edi I