FORM 1 [see Regulation 31 ARCHITECT'S CERTIFICATE and for withdrawal of Money from To be submitted at the time of Registration of Ongoing Project Designated Account) DATE 08-12-2022 T0 The M's Shree Swam1 Samarth Traders Rulders and Developers Infront Of Pumapatre Lawns Bhadgaon Road halisaaon- 424101 Krushna Subect Percentage of Completion of Construction Work of New Anand Certificate of MahaRERA Registration Number P49900029087 (only Applicable after Project Registration) having being developed by M/SShree Swami Samarth Traders Builders and Developers. We Prashant R. Deshmukh have undertaken assignment as Architect /Licensed Surveyor of ng Percentage of Completion of Construction Work of having MahaRERA Registration Number p49900029087 (Only Applicable after project Registration. being developed by M/s. Shree Swa Samarth Traders Builders and Developers. Based on Site inspection. with respect to Layout/each of the of the aforesaid Real Estate Project.I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. percentage of the work executed with respect to each of the activity of the entire phase is detailed Tabie B TABLE-A Layout/ Building Wing Number (To be prepared separately for each Layout building/Wing of The Project) Tasks Activity Percentage of Actual Work (2) Done (As on date of this Certificate) (3) Eycavation 100 % Basemernt's (if any 3 Podiurns (if any) A Plinth 100% Stilt Floor 100 % 6. Slabsof Super Structure 100 % Internal walls, Internal Plaster, Floorings, 1) doors and 100 % window witiin flats/Premises Sanitary Fittings within the Flat/Premises 100% 9 Staircases. lift' Wells and Lobbies at each Floor level 100 % Overhead and Underground Water Tanks 10 External plumbing and external plaster, elevation, 100 % Completion of terraces with waterproofing of the Building/wing. 11 Installation of Lifts. water pumps, Fire Fitting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions of environment/CRZ NOC Finishing to entrance lobby/s. plinth protection, paving of areas appurtenant to Building/Wing. Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. Any other activities. TABLE-B CommonAreas (Internal and External Development Works) in respect of the Registered Phase/Project Number Sr Common areas and facilities Proposed Percentage Details No (Yes/No)ofActual (1) (2) (3) Work (5) Done (As on date of the Certificate) Internal Roads & Footpaths (4) 1 2. Water Supply yes 100 % 3. Sewerage (Chamber, lines, Septic Tank, STP). yes 100 % 4. Storm Water Drains 5. Landscaping & Tree Planting yes 100 % 6. Street Lighting 100 % yes 7. Community Buildings 8 Treatment and disposal of sewage and sullage water. 9 Solid Waste management & Disposal 10 Water conservation / Rain water harvesting 100% yes 11 Energy management. 12 fire protection and lire Safety requirements 13 Electrical meter room, sub-station, receiving station. yes 100 % 14 Others (Option to Add more) Your's Faithfully, Signature & Name (IN BLOCK LETTERS) of L.S/ Architect test Prashant deshmukh r HANT Agreed and Accepted BUTLDERS AR2 ERS CA/2015/ 70764 RDES Signature of PromotePARTNER Name: Date Pruvin Balkrishnca ghokare ARCH o81212022