FORM - 2 ENGIN EER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account - project wise) To Date: 06/05 /2022 Sai Krushna Associates, 56, Shivram Nagar, Jalgaon-425001. Subiect: Certificate of Cost Incurred for Devetopment of "SAl KRUSHANASHA,, for Construction Work of One Building(s)/ Wing(s) situated on the Plot bearing C.N. No / CrS ruo. / Survey no./Gat No. t8212 Final Plot no.t3+t413 demarcated by its boundaries (latitude and longitude of the end points) Adj.P.No. 15 to the North, Adj.P.No. 12 to the South, 3O-meter-wide road to the East, Adj.P.No. t3+14/2 & t3+L4/3 to the West of at Savkheda Bk Shivar, Taluka/District Jalgaon plN 425OOl admeasuring 525.00sq.mts. Area being devetoped by Sai Krushna Associates. Ref. RERA Registration Number p49900028510. Sir, l/ we Hemant J. Nyati have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under RERA, being One Building(s)/ Wing(s) of the ,,SAl KRUSHANASHA" Building situated on the plot bearing C. N. No/ CTS No. Survey no. / Gat No 1g2/2 Plot no.13+14/3 Taluka/ District Jalgaon PIN 425001 admeasuring 525.00 sq.mts. Area being developed by Sai Krushna Associates. 1. Following technical professionals are appointed by owner / promoter: - (i) Shri. Hemant J. Nyati as L. S. / Architect/Engineer, Structural Consultant; 2. We have estimated the cost of the completion to obtain Occupation Certificate / Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. our estimated cost calculations are based on the Drawings / plans made available to us for the project under reference by the Developer and Consultant and the Schedule of times and quantity for the entire work as calculated by Hemant J. Nyati quantity Surveyor* appointed by Developer/ Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs.99,32,000/-. The estimated Total Cost of project iswith reference to the Civil, MEp, and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from the Jalgaon Municipal Council being the planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs. 98,00,898/-. The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 5. The planning cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject / project to obtain Occupation Certificate Completion Certificate from Jalgaon Municipal Council (planning Authority) is estimated at Rs. 99,32,000. 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B Below. TABLE - A (to be prepared separately for each Building / Wing of the Real Estate Project) Sr. No. Particulars Amounts t Total Estimated cost of the building/wing as on 10/02/2O2I date of Registration is Rs.99,32,000/- 2 Cost incurred as on 3O|O9/202I (based on the Estimated cost) Rs.98,00,898/- 3 Work done in Percentage (as Percentage of the estimated cost) 98.68% 4 Balance Cost to be lncurred (Based on Estimated Cost) Rs.1,31,102/- 5 Cost Incurred on Additional / Extra ltems as on -not included in the Estimated Cost (Table C) Rs. Nil/- TABLE -B (To be prepared forthe entire registered phase ofthe Real Estate Proiect) Sr. No. Particulars Amounts t Total Estimated cost of the Internal and External Development Works including amenities and Rs.99,32,000/- Facilities in the layout as on LO/OZ/2OZL date of Registration is 2 Cost incurred as on 3O/O9/202L (based on the Estimated cost) Rs.98,00,898/- 3 Work done in Percentage (as Percentage of the estimated cost) 98.68% 4 Balance Cost to be Incurred (Based on Estimated Cost) Rs.t,3t,LO2l- 5 Cost Incurred on Additional/ Extra ltems as on not included in the Estimated Cost (Table C) - Rs. Nil/- & i";"I'C J " ?'.lY A.TI T'1;'Y:*'il.jt Js1 ,ii',ii f,i'; l',1';r,rciilSl f;0rporal on Hemanf J. Nyati B.E.Civil (Lic. No. 16) r:'dfithi!ji:n L"l'lr. 16 7 Polan Peth, Z,t :,C l-,,\ t! ili:T 11,.J ALGAO -l': - ' '.r'.f N I ''j ',, \J Jalgaon-42500L. Agreed and accepted by: Sign oter Name: Date: 06/05 /2022 1. The scope of work is to complete Registered Real Estate Project as per drawings approved from time to time and as per specifications mentioned in agreement of sale. 2. (*) Quantity survey can be done by office of Engineer or can be done by an independent Quantity Surveyor, whose certificate of quantity calculated can be relied upon by the Engineer. In case of independent quantity surveyor being appointed by Developer, the name has to be mentioned at the place marked (*) and in case quantity are being calculated by office of Engineer, the name of the person in the office of Engineer, who is responsible for the quantity calculated should be mentioned at the place marked (*) 3.(**) Balance Cost to be incurred (4) may vary form Difference between Total estimated Cost (1) and Actual Cost incurred (2) due to deviation in quantity required / escalation of cost etc. As this is an estimated cost- any deviation in quantity required for development of the Real Estate Project will result in amendment of the cost incurred / to be incurred. ' 5.All components of work with specifications are indicative and not exhaustive. 6. Please specify if there are any deviations I qualifications. Example: Any deviations in input material used from specifications in agreement of sale.