FORM - 2 ENGIN EER'S CERTI FICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account - Project wise) To Date:7O/02/2O2L Sai Krushna Associates, 55, Shivram Nagar, Jalgaon-425001. Subject: Certificate of Cost Incurred for Development of 'SAt KRUSHANASHA' for Construction Work ofOne Building(s)/ Wing(s) situated on the Plot bearing C.N. No / CTS No. / Survey no./Gat No.L82l2 Final Plot no.l3+t413 demarcated by its boundaries (latitude and longitude of the end points) Adj.P.No. 15 to the North,Adj.P.No. 12 to the South,3O meter wide road to the East, Adj.P.No. L3+t412 & t3+t413 to the West of at Savkheda Bk Shivar, Taluka/District Jalgaon PtN 425OOt admeasuring 525.00sq.mts. Area being developed by Sai Krushna Associates. Ref. RERA Registration Number_. Sir, l/ we Hemant J. Nyatihave undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under RERA, being One Building(s)/ Wing(s) of the"SAl KRUSHANASHA" Building situated on the plot bearing C. N. No/ CTS No. Survey no. / Gat No L82/2Plot no.t3+L4/3Ialuka/ District Jalgaon PIN 425001 admeasuring525.00sq.mts. Area being developed by Sai Krushna Associates. 1. Following technical professionals are appointed by Owner / Promoter:- (i) Shri. Hemant J. Nyati as L. S. / Architect/Engineer, Structural Consultant; 2. We have estimated the cost of the completion to obtain Occupation Certificate / Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings / plans made available to us for the project under reference by the Developer and Consultant and the Schedule of times and quantity for the entire work as calculated by Anand Amol Mukund quantity Surveyor* appointed by Developer/ Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs.99,32,000/-. The estimated Total Cost of project is with reference to the Civil, MEP, and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from the Jalgaon Municipal Council being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. \ 4. The Estimated cost Incurred till date is calculated at Rs. 99,32,00o/-. The amount of Estimated cogt Incurred is calculated on the base of amount of Total Estimated cost. 5' The Planning cost of completion of the civil, MEP and Allied works of the Building(s) of the subject project to obtain occupation Certificate / Completion Certificate from Jalgaon Municipal Council(planning Authority) is estimated at Rs.99,32,000. 5. I certify that the cost of the civil, MEP and allied work for the aforesaid project as completed on the date of this certificate is as given in Table A and B Below. TABLE - A (to be prepared separately for each Building / wing of the Real Estate project) Sr. No. Particulars Amounts t Total Estimated cost of the building/wing as on LO/O2/2O2L date of Registration is Rs.99,32,000/- 2 Cost incurred as on 7O/02/2O2I (based on the Estimated cost) Rs.22,55,O281- 3 Work done in Percentage (as Percentage of the estimated cost) 22.70% 4 Balance Cost to be lncurred (Based on Estimated Cost) Rs.77,76,9721- 5 Cost fncurred on Additional / Extra ltems as on not included in the Estimated Cost (Annexure A) Rs. Nil/- TABIE. B (To be prepared forthe entire registered phase ofthe Real Estate Project) Sr. No. Particulars Amounts L Total Estimated cost of the Internal and External Development Works including amenities and Rs.99,32,000/- Facilities in the layout as on LO/02/2O2L date of Registration is 2 Cost incurred as on 70/02/2021 (based on the Estimated cost) Rs.22,55,O281- 3 Work done in Percentage (as Percentage of the estimated cost) 22.70% 4 Balance Cost to be lncurred (Based on Estimated Cost) Rs.77,76,9721- 5 Cost lncurred on Additional / Extra ltems as on _ not included in the Estimated Cost (Annexure A) Rs. NiU- -.-. I .'