I FORM 1 ARCH ITECT'S CERTI FICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account - Buildihg/Wing wise) To Date:O7/O7/2O2L Sai Krushna Associates, 56, Shivram Nagar, Jalgaon-425001. Subiect: Certificate of Percentage of Completion of Construction Work of .,SAl KRUSHANASHA"BUiIding(s)One of the Building /ehase of the Project p49990028s10situated on the Pfot bearing C.N. No / CTS No. / Survey no./Gat No. t8212 Final Plot no.t3+L4l3demarcated by its boundaries (latitude and longitude of the end points) Adj.p.No. 15 to the North, Adj.p.No. 12 to the South, 30 meter wide road to the Eas! Adj.P.No. 13+14/2 & t3+L413 to the West of at Savkheda Bk Shivar, Taluka/District Jalgaon PIN 425001 admeasuring 525.00sq.mts. Area being developed by Sai Krushna Associates. Sir, l/ we Hemant J' Nyati have undertaken assignment as Architect / Licensed Surveyor of certifying Percentage of Completion of Construction Work of the"SAl KRUSHANASHA"Bui|ding(S)/ One of the Building / Phase of the Project, situated on the plot bearing C. N. No/ CTS No. /Survey no. / Gat No .L82/2 Plot no.13+14/3 demarcated by its boundaries (latitude and longitude of the end points) Adj.P'No. L5 to the North, Adj.P.No. 12 to the South, 3O-meter-wide road to the East, Adj.p.No. r3+L4/2 & L3+L4/3 to the West of at Savkheda Bk Shivar, Taluka/District Jalgaon ptN 425001 admeasuring szS.bOsq.mts. Area being developed by sai Krushna Associates. 1. Following technical professionals are appointed by owner / promoter:- (i) Shri. Hemant J. Nyati as L. S. / Architect/Engineer, Structural Consultant ; Based on Site Inspection, with respect to each of the Building / Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building / wing of the Real Estate Project as registered vide number p4g90oo28510under RERA is as per table A herein below. The percentage of the work executed with respect to each of the major activity of the Building / Wing and overall Percentage of the work done with respect to each Building / Wing is detailed in the Table B. Sr.No Tasks / Activity Percentage 1 Excavation r00% 2 Plinth 100% 3 RCC- 0 out of05 number ofSlabs ofSuperStructure 80% 4 Masonry/ walls -Completed Till 5 floors 60% 5 Internal Plaster -Completed Till 4 floors 60% 6 ExternalPlaster, elevation- In progress 10% 7 Flooring within Flats / Premises-ln progress on 2no floor 20% 8 Door and Windows to each of the Flat / Premises t0% 9 External plumbing down take lines,CP/ Sanitary Fitting within the 0% Flats / Premises- Electrical Fitting within the Flats / Premises, 10 Electrical switches and wiring inside apartment 30% 11 Painting r0% L2 Staircases, Lifts Wells and Lobbies at eachFloor level connecting 80% Staircases and LiftsOverhead and Underground Water Tanks t3 Completion of terraces with waterproofing of the Building 0% t4 Installation of lifts 0% 16 Fire Fighting Fittings and Equipment's as per CFO NOC 0% t7 Electrical fittings to Common Areas, water pumps,electro - 0% mechanical equipment's 18 Finishing of entrance lobby/s, paving of areas appurtenant to 0% Building, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate TABLE -B Internal & External Development Works in Respect of the project S. No. Common Roads and Facilities, Proposed Percentage of Work Details Amenities (Yes/No) done t Side margin pavement No 0% 2 Water Supply Yes 0% 3 Sewerage (chamber, sewage lines), Yes 0% Storm Water Drains 4 Landscaping & Tree Planting No 0% 5 Common area Lighting No 0% 6 Water conservation, Rain water Yes 0% harvesting 7 Fire protection and fire safety Yes 0% requirements 8 Electrical meter room, sub-station, Yes 0% receiving station HfiIMANT' J. NYI\TI Jelgaon City fulunrcipal C,rrporalrcn B.E.Civil(Lic. No. 15) ENGINEER I .No.I5 7 Polan Peth, T,POLAIJ FFTH,JALGAON Mob.9,1232 7+JB'16 Jalgaon-425001