FORM 1 ARCHITECT'S CERTI FICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account - Building/Wing wise) To Date:24/04/2027 Sai Krushna Associates, 56, Shivram Nagar, Jalgaon-425001. Subject: Certificate of Percentage of Completion of Construction Work of "SAl KRUSHANASHA"BuiIding(s)One of the Building /thase of the Project P49900028510situated on the Pfot bearing C.N. No / CIS No. / Survey no./Gat No. t8212 Final Plot no.l3+t413 demarcated by its boundaries (latitude and longitude of the end points) Adj.P.No. 15 to the North, Adj.P.No. 12 to the South, 30 meter wide road to the East, Adj.P.No. 13+14/2 & t3+t413 to the West of at Savkheda Bk Shivar, Taluka/District Jalgaon PIN 425001 admeasuring 525.00sq.mts. Area being developed by Sai Krushna Associates. Sir, l/ we Hemant J. Nyati have undertaken assignment as Architect / Licensed Surveyor of certifying Percentage of Completion of Construction Work of the"SAl KRUSHANASHA"BuiIding(S)/ One of the Building / Phase of the Project, situated on the plot bearing C. N. No/ CTS No. /Survey no. / Gat No .182/2 Plot no.L3+L413 demarcated by its boundaries (latitude and longitude of the end points) Adj.P.No. 15 to the North, Adj.P.No. 12 to the South, 3O-meter-wide road to the East, Adj.P.No. L3+L4/2 & t3+t4/3 to the West of at Savkheda Bk Shivar, Taluka/District Jalgaon PIN 425001 admeasuring 525.00sq.mts. Area being developed by Sai Krushna Associates. 1-. Following technical professionals are appointed by Owner / Promoter:- (i) Shri. Hemant J. Nyati as L. S. / Architect/Engineer, Structural Consultant ; Based on Site Inspection, with respect to each of the Building / Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building / Wing of the Real Estate Project as registered vide number P49900028510under RERA is as per table A herein below. The percentage of the work executed with respect to each of the major activity of the Building / Wing and Overall Percentage of the work done with respect to each Building / Wing is detailed in the Table B. Table A Sr.No Tasks / Activity Percentage I Excavation 100% 2 Plinth 100% 3 RCC- 0 out of05 number ofSlabs ofSuperStructure 80% 4 Masonry/ walls -completed Till 5 floors 60% 5 Internal Plaster -Completed Till 4 floors 60% 5 ExternalPlaster, elevation- In progress r0% 7 Flooring within Flats / Premises-ln progress on 2nd floor 20% 8 Door and Windows to each of the Flat / Premises t0% 9 External plumbing down take lines,CPl Sanitary Fitting within the 0% Flats / Premises- Electrical Fitting within the Flats / Premises, 10 Electrical switches and wiring inside apartment 30% tl Painting t0% t2 Staircases, Lifts Wells and Lobbies at eachFloor level connecting 80% Staircases and LiftsOverhead and Underground Water Tanks 13 Completion of terraces with waterproofing of the Building 0% t4 lnstallation of lifts 0% 16 Fire Fighting Fittings and Equipment's as per CFO NOC 0% t7 Electrical fittings to Common Areas, water pumps,electro - 0% mechanical equipment's 18 Finishing of entrance lobby/s, paving of areas appurtenant to 0% Building, Compound Wall and all other requirements as may be required to obtain Occupation / Completion Certificate TABTE - B Internal & External Development Works in Respect of the project S. No. Common Roads and Facilities, Proposed Percentage of Work Details Amenities (Yes/No) done t Side margin pavement No 0% 2 Water Supply Yes 0% 3 Sewerage (chamber, sewage lines), Yes 0% Storm Water Drains 4 Landscaping & Tree Planting No 0% 5 Common area Lighting No 0% 6 Water conservation, Rain water Yes 0% harvesting 7 Fire protection and fire safety Yes 0% requirements 8 Electrical meter room, sub-station, Yes 0% receiving station J"TS B.E.Civil(Lic. No. 16) l{:ili-il {i I 7 Polan Peth, .., i--r', .' ; , r"r''-l l-l i.t' t" ir;1i11 | .r / Jalgaon-425001 iii,, I .'II,]'.-,:': -lo '";