FORM -2A ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE (Site supervisor’s certificate) (To be uploaded quarterly) To, AdityaBuildrs &, Developers 20/1, Ringroad, Jalgaon-425001 Quality Assurance Certificate (Certificate no. 2A-001for the quarter ending 31/03/2020) Subject:-Certificate for quality of materials used and quality for Construction and work of 1 no. Of Building “ Aditya Gold City” of the project situated on the plot bearing survey no.38/2a/1 Near Godavari Engineering collage, national Highway 06, Besides Royal Enfield Showroom, MIDC Area, Khedi Bk. shivar, dist Jalgaon 425001 being developed by Aditya Builders & Developers, Jalgaon Ref: MahaRERA Registration Number: - P49900023478 Sir, I Milind Rathi, have undertaken an assignment of this real estate project. 1. Our Responsibility: - To carry out the work in accordance with the developmentpermission and as per theapproved plan and submit certificate of supervision of work and to carry out materialtesting in- situ or in the authorized laboratory and to ensure quality of work andworkmanship as per prescribed specifications, and as per NBC and or other relevantcode of practice. I) MaterialTesting:- I have applied following mandatory checks on the basic materials,used in the construction. i) Cement- It has been tested for its fineness, soundness, setting time, compressivestrength etc. as per lS code 3535:1986 or as per other relevant lS/85/NBC code, or as per industry standards and its results are within the permissible limits. ii) Coarse aggregate - It has been tested, for deleterious materials, clay lumps, crushing value,impact value as per lS 243011986 or as per other relevant IS/BS/NBC code or as per industry standards and its results are within the permissible limits. iii) Bricks/ blocks – They have been tested for water absorption, crushing strength etc. as perlS 5454:1978 or as per other relevant lS/85/NBC code or as per industry standardsand its results are within permissible limits. iv) Concrete / Ready-mix Concrete- It has been tested for compressive strength for various periods as per 15 456:2000 and lS 1199 or as per other relevant IS/BS/NBC codes, as per industry standards and its results are within permissible limits. v) Steel for concrete- It has been tested as per lS 2062:2011 or as per other relevant ls/Bs/NBC code or as per industry standards for tensile streneth, elongation and gauge length etc. and its results are within permissible limits. vi) Testing of Other materials – Other materials like sand, crushed sand, floor tiles, fixtures and {ittings,pipes and sanitary fittings etc. (List out all items) used in this project conform torelevant IS/BS/NBC code or as per standards laid down by the lndustry for aparticular material. 2. Workmanship: - I hereby certify that work has been carried out under our supervision. We further certify that workmanship and quality is satisfactory and up to the mark and the work has been acceptable within the permissible limits of deviations as per relevant code of practice. 3. Electrical Materials and workmanship: - Works of all the electrical wiring/ connections / lift installation / otherelectrical installations have been carried out under authorized /registeredelectrical en8ineer and its .ecords has been maintained. The materials usedconform to the relevant l.S/ B.S/ National Buildin8 codes or as per industrystandards. 4. Structural engineer:- Promoters has engaged structural engineer Mr. Milind Rathihaving Licenses no. M-125145-1 having office no. 0257-2210979. The structural design of buildings in this project has been done underhissupervision. He has checked the soil report before laying PCC for foundation inconsultation with soil consultant. The formwork and concrete mix design has beendone as per lS 10262:2009 or as per other relevant codes as applicable. Hisperiodic checks and certificates for STABILITY and SAFETY have been kept onrecord. 5. Preservation of records: - Record of all test results of this project have been properly kept in theprescribed formats and will be preserved at least up to the defect liability period or for the period as required by any other provision of law. 6. No materials or any other item of works which was not conforming to the standard specifications and which were not rejected. Yours Faithful Milind Rathi (License No – M-125145) Chartered Engineer Agreed & accepted by: Name: Sumeet Prakashchand Mutha Date: 28/01/2026