FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE Date: 10-04-2021 To, Aditya Builders & Developers, 20/1, Ring Road, Jalgaon-425001. Subject: Certificate of Cost Incurred for Development of “Aditya Gold City” for Construction of Diamond Tower (Maha RERA Registration Number P49900023478) situated on the Plot bearing S. NO.– 38/2A/1, near Godavari Engineering Collage, National Highway, Beside Royal Enfield Showroom, MIDC Area Jalgaon. Demarcated by its boundaries towards the north – National Highway No. 6, towards the south – Side road, towards the east – S.No. 38/2B/A, towards the west – S. no. 38/1 of Khedi Shivar, Dist. Jalgaon 425001, being developed by Aditya Builders & Developers. Ref: MahaRERA Registration Number: P49900023478 Sir, I Milind Shyamsundar Rathi have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being 1 Building situated on the S. NO.– 38/2A/1, near Godavari Engineering Collage, National Highway, Beside Royal Enfield Showroom, MIDC Area Jalgaon. Area being developed by Aditya Builders & Developers. 1. Following technical professionals are appointed by Owner /Promoter:- (i) Shri. Milind Rathi asArchitect; (ii) Shri. Milind Rathi as StructuralConsultant (iii) Shri. Milind Rathi as Quantitysurveyor (iv) Shri. Nachiket JakhetiyaasCA Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide Number P49900023478 under MahaRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. 1 Table A Building /Wing Number : Diamond Tower Sr. Tasks /Activity Percentage No of work done 1 Excavation 100% 2 number of Basement(s) and Plinth 100% 3 number of Podiums No 4 Stilt Floor NO 5 8 number of Slabs of Super Structure 100 % 6 Internal walls, Internal Plaster, Floorings within 35% Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical 0% Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each, Floor level 53% connecting Staircases and Lifts , Overhead and Underground Water Tanks 9 The external plumbing and external plaster, 30% elevation, completion of terraces with waterproofing of the Building/Wing, 10 Installation of lifts, water pumps, Fire Fighting Fittings 22% and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be Total Percentage Work 29.00% 2 TABLE-B Internal & External Development Works in Respect of the entire Registered Phase S.No Common areas Proposed Percentage of Details and Facilities, (Yes/No) Work done 1. Internal Roads & Footpaths No 0% 2. Water Supply Yes 25 % Bore Well 3. Sewerage (chamber, Yes 40% Undergro lines, Septic Tank ,STP) und Tank 4. Storm Water Drains Yes 0% 5. Landscaping & Tree Planting Yes 0% 6. Street Lighting No 0% 7. Community Buildings No 0% 8. Treatment and disposal Yes 0% of sewage and sullage water 9. Solid Waste No 0% management & Disposal 10. Water conservation, Yes 0% Rain water harvesting 11. Energy management No 0% 12. Fire protection and fire safety Yes 0% requirements 13. Electrical meter room, sub- No 0% station, receiving station 14. Others ( Option to Add No 0% more) Total Percentage Work 10.00% 3 Yours Faithfully MILIND RATHI (License NO: 002) 4