Annexure-C FORM-2A [See MahaRERA Order No.5 of 2018] ENGINEER'S CERTIFICATE FOR QUALITY ASSURANCE (SiteSupervisor's Certificate) Date:15/04/2024 To, Pushpak Onkar Narkhede, Flat No6 Plot No 49, Akshar Homes, Ganesh Wadi, Panchmukhi Hanuman, Pande Chouk, Jalgaon - 425001 Quality Assurance Certificate (Certificate No. 02for the year ending2020-21) Subject: Certificate for quality of materials used and quality of Construction and workmanship for the Work ofShri Sai Vihar having MahaRERA Registration Number P49900023896being developed by Pushpak Onkar Narkhede Sir. I/ We have undertaken an assignment of supervision of this real estate project. Our Responsibility. IWe are responsible for carrying out the work in accordance with the development permission and as per the approved plan and submit certificate of supervision of work and to carry out material testing in-situ or in the authorizedlaboratory and to ensure quality of work and workmanship as per prescribed specifications, and as per NBC and or other relevant code of practice. 1. Input Material, Fixtures and Fittings Vwe hereby certify that all Construction material, Fixture and Fitting with regard to the Flooring, Electrical, Sanitary Fitting etc. and amenities to be provided by the Promoter in the said Project, buildingand the Apartment are as per specifications mentioned in Annexure 'E, of Agreement of Sale. For those items, where no specificationshave been mentioned in agreement of sale, the material, Fixtures and Fitting used conform to the relevant BIS Standard/ IS/ National Building codes or as per industry standards. 2.Workmanship- /we hereby certify that work has been carried out under our supervision. We further certify that workmanship and quality is satisfactory and upto the mark and the work has been acceptable within the permissible limits of deviations as per relevant code of practice. 3. Structural engineer- Promoters has engaged structural engineer Mr.. having Licenses No. having Office No. Cell No. The structural design of buildings in this project has been done under his supervision. The formwork and concrete mix design has been done as per IS 10262:2009 or as per other relevant codes as applicable. His periodic checks and certificates for STABILITY and SAFETY have been kept on record. 4. Preservation of records Record of all test results of this project have been properly kept in the prescribed formats and will be preserved at least up to the defect liability periodor for the period as required by any other provision of law. Please specify deviation in quality of materials or any other item of work which were not conforming to the specifications as mentioned in the Agreement of Sale. Agreed and accepted by: Yours Faithfully, C:EEPAKS.NARKH: Jalgaon City Municipal Corporati, Licensed Engineer. L.No.034 AYODHYA NAGAR,JALGAON Mob.9881004839 Signatyre of promoter Signature of Engineer (Site Supervisor) Pushpak Onkar Narkhede Name: Date: Qualification (not less than graduate) License No. (if any) Phone no. Place: