DE| SlGN BALAJI DESIGN STUDIO ARCHITECTURE INTERIOR DESIGN, PLANNING. LANDSCAPE Annexure A FORM 1 (See Regulation 3) ARCHITECT'S CERTIFICATE (As on 25-02-2022) To, Pushpak Onkar Narkhede, Flat No6 Plot No 49, Akshar Homes, Ganesh Wadi, Panchmukhi Hanuman, Pande Chouk, Jalgaon - 425001 Subject: Certificate of Percentage of Completion of Construction work as on 25-02-2022of Shri Sai Viharhaving MahaRERA Registration Number:P49900023896being developed by Pushpak Onkar Narkhede. Sir, /We Ar. Yash Pankaj Sheth have undertaken assignment as Architects/Licensed Surveyorof certifying Percentage of Completion of Construction work of Shri Sai Viharthe building having MahaRERA Registration Number:P49900023896being developed by Pushpak Onkar Narkhede. Based on Site Inspection,with respect to Layout/each of the Building Wing of the aforesaid Real Estate Project, Icertify that as on the date of this certificate, the Percentage of Work done for each of the building / wing of the Real Estate Project under MahaRERA is as registered as per Table - A herein below. The percentage of the work executed with respect to each of the activity of the entire phase isdetailed in Table B. BALAJIDESIGN STUDIO ARCHITECTURE . INTERIOR DEsIGN, PLANNING. LANDSCAPE Table A Building Number01 Sr.No Task/Activity Percentage of Work Done (25-02-2022) (1) (2) (3) 1. Excavation 100% 2. Number of Basement(s) 100% 3 Number of Plinth 100% 4 Number of Podium 100% 5 Stilt Floor 100% 6 Slabs of Super Structure 100% 7 Internal walls, Internal Plaster Floorings, Doors and Windows within Flat/Premises 100% 8. Sanitary Fittings within the Flat/Premises. 100% 9 Staircases, Lifts Wells and Lobbies at each Floor level 100% Overhead and Underground Water tanks. The external plumbing and external plaster, elevation, 10. completion of terraces with waterproofing of the 100% Building/Wing. Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, Compliance to conditions of environment /CRZ 11. NOC, finishing to entrance lobby/s, plinth protection, paving 100% of areas appurtenant to Building/Wing, Compound Wall protection and allother requirements as may be required to complete project as per specification in agreement of sale. Any other activities. slGN BALAJI DESIGN STUDIO TABLE-B Common Area (Internal and Ex ternal Development Works) for SHRI SA VIHAR Sr. Common areas and Facilities. Percentage Proposed of Work Details No (Yes/No) Done Amenities (25-02-2022) (1) (2) (3) (4) (5) 1 Internal Roads &Footpaths Yes/No NA 2 Water Supply Yes/No 100% ----NA--- 3. Sewerage (chamber, lines, 100% ----NA- Yes/No Septic Tank, STP) 4. Storm Water Drains Yes/No 100% ----NA--- 5. Landscaping & Tree Planting Yes/No 100% ----NA 6. Street Lighting Yes/No 0 ---NA-- 7. Community Buildings Yes/No 0 ---NA-- 8 |Treatment and disposal of Yes/No ---NA-- sewage and sullage water. 9. Solid Waste Management & ---NA-- Yes/No Disposal 10. Water Conversation & Rain ---NA-- Yes/No 100% Water Harvesting 11. Energy Management Yes/No ---NA-- 12. Fire Protection and fire Yes/No 0% ---NA-- Safety requirements 13. Electrical metre room, sub Yes/No 100% ----NA--- station, receiving station. 14. Others (options to add Yes/No more) Yours Faithfully, Agreed andAccepted by. Signature &Name (N BLOCK LETTERS) of Sigrature of Promoter LS/Architect Pushpak Onkar Narkhede (License No - P.SHETH Ar. YASH (B.Arch.t.) Date: CA/2018/90948 Shree Balaji Intrastructura, Gokul Building, Opp.Khwaja Miya Dargah, isnesh Colony Road,Jalgaon