FORM2 ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account - Date: 08-03-2020 To N & L ASSOCLATES 56 Shiwam Nagar M.J.College Raod, Jalgaon I Subject: Certificate of Cost Incuned for Development of (Shree Sai Sona Pl"za) for Construction of Shree Sai Sona P|aza building(s)_0_Wing(s) of the 0 phase (RERA Registration Number) situated on the Plot beuing /CTS No.1697/Nl9/1+1697N19/2 of Division Jalgaon Tal,{Dist Jalgaon PIN 425001 developed by N & L ASSOCIATES Demarcated by its boundaries (latitude and longitude ofthe end points) 4.50 M PATIIWAYTo the North1697N2O to the South 10 M WDE ROAD to the East BOLE to the West of Division JALGAON village JALGAON taluka JALGAON District JALGAON PIN 425001 admeasuring 318 60 sq.mts area being developed by (Promoter) Ref RERA Registration Number _P 49900019598 Sir, VWe HEMANT JAGNNATH NYATI have undertaken assignment of certi$ing Estimated Cost for the Real Estate Project proposed to be registered underGujRERA, being SHIR SAI SONA PLAZA Building(s/ 0 Wing(s) ofthe 0 Phase situated on the plot bearing C.N. No/CTS No./Suwey no.iFinal Plot no.1697N19/l+1697N19/2 of Division JALGAON village JALGAON taluka JALGAON District JALGAON PIN 425001 admeasuring 318 60 sq.rnts. area being developed by l. Following tecbnical professionals are appointed by Owner/Pronoter:- (as applicable) (i) lWs./Shri/Smt.HEMANT JAGNNATH NYATI as Architect{Engineer (ii) tWs /Shri/Smt.ANAND AMOL MUKUND as Structural Consultant (iii) lWs./Shri/Smt. as MEP Consultant (iv) IWs /Shri/Smt.SAGAR SUBFL{SH INGALE as Site Supewisor 2. We have estimated the cost of the completion to obtain Occupation Certificate/Completion Certificate, of the Civil, MEP and Alliedworks,oftheBuilding(s)oftheproject. OurestimatedcostcalculationsarebasedontheDrawing/Plansmadeavailableto us for the project under reference by the Developer and Consultants ard the Schedule of items and quantity for the entire work as calculated by quantity Surveyor appointed by Developer/Engineer and the site inspection carried out by us. 3. We estimate Total Estimated Cost ofcompletion ofthe building(s) ofthe aforesaid project under reference as Rs 1,91,40,000/- (Total of Table A and B). The estimated Total Cost of Proiect is with reference to the Civil. MEP and allied works reouired to be completed for tle purpose of obtaining occupation certificate/completion certificate for the building(s) from the being the Planning Authority under whosejurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incuned till date is calculated at (Total of Table A ald B). The amount of Estimated Cost Incuned is calculated on the base ofamount ofTotal Estimated Cost 5 The Balance Cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate/Completion Certificate from @lanning Authority) is estimated at Rs (Total ofTable A ard B). 6. I certi$ that the Cost ofthe Civil, MEP and allied work for the aforesaid Project as completed on the date ofthis certificate is as given in Table A and B below; Table - A BuildingAVing bearing Number or called (to be prepared separately for each Building/lVing ofthe Real Estate Project) Amount Sr. No Particulars /in Rc t I Iotal Estimated Cost ofthe buildins/wine as on date ofReeistration is r9140000.0( 2 lost incuned as on 3lll2/2020 17628800 0( 3 Work done in Percentage (as Percentage ofthe estimated cost) 9201 4 Balance Cost to be Incurred fBased on Estimated Cost) 151 1200 0( 5 lost Incurred on Additional/Extra Items as on not included in the Estimated Cosl 'Table{) Table - B (to be prepared for the entire registered phase ofthe Real Estate Project) Amount Sr. No Common areas and Facilities Amenities (in Rs.) Total Estimated Cost of the Intemal and Extemal Development Works including amenities anc I Facilities in the lavout as on date ofReeistration is 2 lost incurred as on J Work done in Percentase (as Percentase ofthe estimated cost) #DIV/O! 4 lalance Cost to be Lncuned (Based on Estimated Cost) 00t 5 lost Incurred on Additional/Extra Items as on not included in the Estimated Cost Table{) :rE?' 1::-, - :r Sign fthe Engineer: 1;- l -rriJ--- '' Iable - C List ofExtra/Additional Items executed with Cost Sr. No. Items Cost I 2