FORM2 ENGINEER'S CXRTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account - Date: l2-lO-202O To N & L ASSOCIATES 56 Shivram Nagar M J College Raod, Jalgaon Subject: Certificate of Cost Incurred for Development of (Shree Sai Sona Plaza) for Construction of Shree Sai Sona Plaza building(s)_0_Wing(s) of the 0 phase @ERA Registration Number) situated on the Plot bearing /CTS No 1697lNl9/1+1697 NI9/2 of Division Jalgaon Tal/Dist Jalgaon PIN 425001 developed by N & L ASSOCIATES Demarcated by its boundaries (latitude ald longitude ofthe end points) 4.50 M PATHWAYIo the No(h1697Al20 to the South 10 M WIDE ROAD to the East BOLE to the West of Division JAIGAON village JALGAON taluka JAIGAON District JALGAON PIN 425001 admeasuring 31860 sq.mts. area being developed by @romoter) Ref: RERA Registration Number _P 49900019598 Sir. VWe FIEMANT JAGNNATH NYATI have undertaken assignment of certirying Estimated Cost for the Real Estate Project proposed to be registered under GujRERA, being SHIR SAI SONA PLAZA Building(s/ 0 Wing(s) of the 0 Phase situated on the plot bearing CN. No/CTS No/Survey no/Final Plot no1697A./19/1+1697N1912 of Division JALGAON village JALGAON raluka JAIGAON District JAIGAON PIN 425001 admeasuring 318 60 sq mts area being developed by I Followingtechnical professionals are appointed by Owner/Promoter:- (as applicable) (i) lWs./Shri/Smt FIEMANT JAGNNATH NYATI as Architect/Engineer (ii) lWs /Shri/Smt.ANAND AMOL MUKUND as Structural Consultant (iii) lWs /Shri/Smt as MEP Consultanl (iv) lWs./Shri/Smt.SAGAR SUBHASH INGALE as Site Supervisor 2 We have estimated the cost of the completion to obtain Occupation Certificate/Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawing/Plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by quantity Surveyor appointed by Developer/Engineer and the site inspection carried out by us 3. We estimate Total Estimated Cost ofcompletion ofthe building(s) ofthe aforesaid project under reference as Rs.1,91,40,000/- (Total ofTable A and B) The estimated Total Cost ofProject is with reference to the Civil, MEP and allied works required to be completed for the purpose ofobtaining occupation certificate/completion certificate for the building(s) from the being the Planning Authority under whosejurisdiction the aforesaid project is being implemented 4. The Estimated Cost Incuned tilldate is calculat& at (Total of Table A and B) The aaount of Estimated4osl Incurred is calculated on the base ofarnount ofTotal Estimated Cost \ 5. The Balance Cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtfin Occupation Certificate/Completion Certificate from @lanning Authority) is estimated at Rs. (Total ofTable A and B) 6 I certiff that the Cost of the Civil, MEP and allied work for the aforesaid Proiect as completed on the date ofthis certificate is as given in Table A and B below; Table - A BuildingAVing bearing Number or called (to be prepared separately for each Building/IVing ofthe Real Estate Project) Amount Sr. No Particulars (in Rs.) I Iotal Estimated Cost ofthe building/wing as on date ofRegistration is 19140000 0( 2 lost incurred as on 3010912020 148005I 1.0( 7701 J ilork done in Percentage (as Percentage ofthe estimated gost) 4 lalance Cost to be Incuned (Based on Estimate Table - B (to be prepared for the entire registered phase ofthe Real Estate Project) Amount Sr. No Common areas and Facilities Amenities (in Rs.) Total Estimated Cost of the Intemal and Extemal Development Works including amenities an( on Facilities in the layout as date ofRegistration is 2 lost incurred as on ,iiiiir: liX , 3 Work done in Percentage (as Percentage ofthe estimated cost) #DIV/O! 4 lalance Cost to be Incurred (Based on Estimated Cost) 000 lost Incurred on AdditionavExtra Items as on not included in the Estimated cos 5 'Table{) l*blMAIs . Jalgm'O.ity muptc - EN9TINEER . 7'POLAN FE T'.i ' Mof.9S":..' Tabld; C List ofExtra/Additional Items executed with Cost were not part ofthe Estimate Sr, No. Items Cost 2