FORM 2 ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account - Date: l4-Ot2020 To N & L ASSOCIATES 56 Shiwam Nagar M.J.College Raod, Jalgaon Subject: Certificate of Cost Incuned for Development of (Shree Sai Sona Plaza) for Construction of Shree Sai Sona plaza building(s)0lWing(s) of the 0 phase (MahaRERA Registration Number P49900019598) situated on the plot bearing /CTS No.l697/N19ll+1697 N19/2 of Division Jalgaon Tal/Dist Jalgaon PIN 425001 developed by N & L ASSOCIATES Demarcated by its boundaries (latitude and longitude ofthe end points) 4.50 M PATIIWAYTo the Northl697N20 tothe South l0 M WIDE ROAD to the East BOLE to the West of Division JALGAON village JALGAON taluka JALGAON District JALGAON PIN 425001 admeasuring 318.60 sqmts area being developed by Jitendra Prabhakar Lathi. Ref: RERA Regisfation Number P 49900019598 Sir, VWe I{EMANT JAGNNATH NYATI have undertaken assignment of certirying Estimated Cost for the Real Estate Project proposed to be registered under MahaRERA, being SHIR SAI SONA PLAZA Building(s/ 0 Wing(s) of the 0 Phase situated on the plot bearing C.N No/CTS No/Suwey no./Final Plol no 16974,/19ll+1697N1912 of Division JAIGAON village JALGAON taluka JALGAoN District JALGAON PIN 425001 admeasuring 3 I 8.60 sq.mts. area being developed by 1 Following technical professionals are appointed by Omer,/Promoter:- (as applicable) (i) lWs./Shri/Smt.lIEMANT JAGNNATH NYATI as Archirect/Engineer (ii) iWs./Shri/Smt.ANAND AMOL MUKUND as Structural Consultant (iiD lWs./Shri/Smt. as MEp Consultant (iv) lWs./Shri/Snt.SAGAR SUBIIASH INGALE as Site Supervisor 2. We have estimated the cost of the completion to obtain Occupation Certificate/Completion Certificate, of the Civil, MEp and Allied works, ofthe Building(s) ofthe project. Our estimated cost calculations are based on the Drawing/Plans made avaitable to us for the project under reference by the Developer and Consultants and the Schedule of items and quantitv for the entire work as calculated by quantity Surveyor appointed by Developer/Engineer and the site inspection carried out by us 3. We estimate Total Estimated Cost ofcompletion ofthe building(s) ofthe aforesaid project under reference as Rs 1,91,40,000/- (Total of Table A and B). The estimated Total Cost of Project is with reference to the Civil, MEp and allied works required to be completed for the purpose ofobtaining occupation certificate/completion certificate for the building(s) from the being the Plaaning Authority under whosejurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incuned till date is calculated at _ (Total of Table A and B). The amount of Estimated Cosl Incuned is calculated on the base ofamount ofTotal Estimated Cost. 5. The Balance Cost of Completion of the Civil, MEP and Allied works of the Buitding(s) of the subject project to obtain Occupation Certificate/Completion Certificate from @lanning Authority) is estimated al Rs (Total ofTable A and B). 6. I certiry that the Cost ofthe Civil, MEP and allied work for the aforesaid Project as completed on the date ofthis certificate is as given in Table A and B below; Table - A BuildingAVing bearing Number or called (to be prepared separately for each BuildingAVing ofthe Real Estate Project) Amount Sr. No Particulars (in Rs-) I fotal Estimated Cost ofthe buildindwing as on - dale ofRegistration is 19140000.00 2 lostincuned as on 31112/2019 9076199 0A J Work done in Percentase (as Percentage ofthe estimated cost) 4704 4 lalance Cost to be Incuned (Based on Estimated Cost) 10063801.00 5 --ost Incuned on Additional/Extra Items as on not included in the Estimated Cos Tahle{) Table - B (to be prepared for the entire registered phase ofthe Real Estate Prcject) Amount Sr. No Common areas and Facilities Amenities (in Rs-) Total Estimated Cost of the Intemal and Extemal Development Works including amenities an( 1 on Facilities in the lavout as date ofRegistration is 2 lost incurred as on J Work done in Percentage (as Percentage ofthe estimated cost) #Dry/0! A Balance Cost to be Incuned (Based on Estimated Cost) 00t lost Incuned on AdditionaVExfia Items as on not included in the Estimated Cos 'Table{) 3f nl' ii. t'f 1'ATI Lriirnici;:al C crPc;alicn ER L.t'1o.16 7,POi-A.nl P ETI-{, JAL GAON Mob.94222v9876 Table- C List ofExtra/Additional Items executed with Cost were not part ofthe Sr. No. Items Cost 2