FORM 2 ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account - Date: 04-10-2019 To N & L ASSOCIATES 56 Shivram Nagar M.J.College Raod, Jalgaon Subject: Certificate of Cost Incurred for Development of (Skee Sai Sona Plaza) for Construction of Shree Sai Sona Plaza building(s)_0_Wing(s) of the 0 phase (GujRERA Registration Number) situated on the Plot bearing /CTS No.l697/Nl9ll+1697 NI9/2 of Division Jalgaon TaVDist Jalgaon PIN 425001 developed by N & L ASSOCIATES Demarcated by its boundaries (latitude and longitude ofthe end points) 4 50 M PATIIWAYIo the No(h 1697 NzO to the South 10 M WIDE ROAD to the East BOLE to the West of Division JAIGAON village JALGAON taluka JAIGAON District JALGAON PIN 425001 admeasuring 318.60 sq.mts. area being developed by (Promoter) Ref: GujRERA Registration Number _P 49900019598 Sir. LTVe IIEMANT JAGNNATT{ NYATI have undertaken assignment of certifing Estimated Cost for the Real Estate Project proposed to be registered under GUjRERA, being SHIR SAI SONA PLAZA Building(s)/ 0 Wing(s) ofthe 0 Phase situated on the plot bearing CN No/CTS No/Survey no./Final Plot no1697A,/191I+1697N19/2 of Division JALGAON village JALGAON taluka JALGAON District JALGAON PIN 425001 admeasuring 31 8.60 sq.mts. area being developed by l. Following technical professionals are appointed by Owner/Promoter:- (as applicable) (D IWs /Shn/Snt IIEMANT JAGNNATH NYATI as Architect/Engineer (ii) N{/s./Shri/Smt ANAND AMOL MUKUND as Structural Consultant (iii) lWs /Shri/Smt. as MEP Consultant (iv) lWs /Shri/Smt.SAGAR SUBIIASH INGALE as Site Supervisor 2 We have estimated the cost of the completion to obtain Occupation CertificateiCompletion Certificate, of the Civil, MEP and Allied works, ofthe Building(s) ofthe project Our estimated cost calculations are based on the Drawing/Plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by quantity Surveyor appointed by Developer/Engineer and the site inspection carried out by us, 3 We estimate Total Estimated Cost ofcompletion ofthe building(s) ofthe aforesaid project under reference as Rs.1,91,40,000/- (Total ofTable A and B) The estimated Total Cost ofProject is with reference to the Civil, MEP and allied works required to be completed for the purpose ofobtaining occupation certificate/completion certificate for the building(s) from the being the Planning Authority under whose jurisdiction the aforesaid project is being implemented 4 The Estimated Cost Incuned till date is calculated at Ootal of Table A and B). The amount of Estimated Cost lncurred is calculated on the base ofamount ofTotal Estimated Cost. 5. The Balance Cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate/Completion Certificate from @larning Authority) is estimated at Rs (Total ofTable A and B). 6. I certiff that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date ofthis certificate is as given in Table A and B below; Table - A BuildingMing bearing Number or called (to be prepared separately for each BuildingAVing ofthe Real Estate Project) Amount Sr. No Particulars (in Rs-) lotal Estimated Cost ofthe buildine/wins as on date ofRegistration is 19140000.0( lost incurred as on 30/09/2019 7210000 0( J ilork done in Percentaee (as Percentase ofthe estimated cost) 38ot ^ lalance Cost to be Incuned (Based on Estimated Cost) 1 1930000 0( 5 lost Incurred on Additional/Extra ltems as on not included in the Estimated Cos Tahle -{]) Table - B (to be prepared for the entire registered phase ofthe Real Estate Project) Amount Sr. No Common areas and Facilities Amenities (in Rs.) fotal Estimated Cost of the Intemal and Extemal Development Works including amenities an< lacilities in the layout as on date ofRegistration is 2 lost incurred as on J Work done in Percentage (as Percentage ofthe estimated cost) #DIV/O 4 lalance Cost to be Incurred (Based on Estimated Cost) 000 5 lost Incurred on AdditionaVExtra Items as on not included in the Estimated Cost Table-C) Table - C List ofExtra/Additional Items executed with Cost were the onsinal Estlmate ot lotal Cost Sr. No. Items Cosl 2