FORM 2 ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account - Date: 06-07-2019 To N & L ASSOCIATES 56 Shiwam Nagar M J.College Raod, Jalgaon Subject: Certificate of Cost Incurred for Development of (Shree Sai Sona Plaza) for Construction of Shree Sai Sona Plaza building(s)_0_Wing(s) of the 0 phase (GujRERA Registration Number) situated on the Plot bearing /CTS No.169714,/19/1+1697 N1912 of Division Jalgaon TallDist Jalgaon PIN 425001 developed by N & L ASSdChTES Demarcated by its boundaries (latitude and longitude ofthe end points) 4 50 M PATHWAYIo the Northl697 N20 to the South 10 M WIDE ROAD to the East BOLE to the West of Division JALGAON village JALGAON taluka JALGAON District JALGAON PIN 425001 admeasuring 318.60 sqmts area being developed by (Promoter) Ref: GujRERA Registration Number _P 49900019598 Sir. VWe IIEMANT JAGNNATH NYATI have undertaken assignment of certi$,ing Estimated Cost for the Real Estate Project proposed to be registered under GujRERA, being SHIR SAI SONA PLAZA Building(s)/ 0 Wing(s) of the 0 Phase situated on the pfot bearing C.N. No/CTS No/Survey no./Final Plot no.l697A"/19/l+1697N.1912 of Division JALGAON village JALGAON talukaJALGAONDistrictJALGAONPIN42500l admeasuring318.60sq.mts areabeingdevelopedby I Following technical professionals are appointed by Owner/Promoter:- (as applicable) (i) lWs./Shri/Smt.HEMANT JAGNNATH NYATI as Architect/Engineer (ii) lWs./Shri/Smt ANAND AMOL MUKIJND as Structural Consultant (iii) lv{/s./ShrVSmt. as MEP Consultant (iv) lWs /Shri/Smt SAGAR SUBHASH INGALE as Site Supervisor 2. We have estimated the cost of the completion to obtain Occupation Certificate/Completion Certificate, of the Civil, MEP and Allied works, ofthe Building(s) ofthe project. Our estimated cost calculations are based on the Drawing/Plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by quantity Surveyor appointed by Developer/Engineer and the site inspection canied out by us 3 WeestimateTotalEstimatedCostofcompletionofthebuilding(s)oftheaforesaidprojectunderreferenceasRsl,9l,40,000/- (Total of Table A and B). The estimated Total Cost of Project is with reference to the Civil, MEP and allied works required to be completed for the purpose ofobtaining occupation certificate/completion certificate for the building(s) fiom the t being the Planning Authority under whosejurisdiction the aforesaid project is being implemented. 4 The Estimated Cost Incuned till date is calculated at _ (Total of Table A and B). The amount of Estimated Cost Incuned is calculated on the base ofamount ofTotal Estimated Cost 5 The Balance Cost of Completion of the Civil, MEP and Allied works of the Building(s) of the sJbject project to obtain Occupation Certificate/Completion Certificate from (Planning Authority) is estimated at Rs (Total ofTable A ard B) 6 I certiff that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below; Table - A BuildingAVing bearing Number or called (to be prepared separately for each Building/IVing ofthe Real Estate Project) Amount Sr. No Particulars (in Rs-) Iotal Estimated Cost ofthe building/wing as on date ofRegistration is 19140000 00 2 lostincurredason 30106D019 4293660 00 J Work done in Percentase (as Percentase ofthe estimated cost) 22% + Jalance Cost to be Incuned (Based on Estimated Cost) 14846340 0C 5 lost Incuned on Additional,/Extra Items as on not included in the Estimated Cost 'Table{) Table - B (o be prepared for the entire registered phase ofthe Real Estate Project) Amount Sr. No Common areas and Facilities Amenities (in Rs-\ Total Estimated Cost of the Intemal and Extemal Development Works including amenities and on Facilities in the lavout as date ofResistration is 2 lost incurred as on J Work done in Percentase (m Percentase ofthe estimated cost) #DIV/O! 4 Balance Cost to be Incuned (Based on Estimated Cost) 000 lost Incuned on Additional/Extra Items as on not included in the Estimated Cosl 5 'Tqhla -f\ Table- C 'ii't xtralAdditional ltems executed with Cost 7 Lb 7 notoartoftheoricinalEstimateofTotalCosl Sr, No. F. Items Cost 2 -' -, ,!,