FORM 1 ARCHITECT'S CERTIFICATE To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 08-03-202f To TheN&LASSOCIATES. 56,SHIVRAM NAGARI\4J COLLAGE ROAD. JALGAON Subject: Certificate of Percentage of Completion of Construction Work of " Shree Sai Sona Plaza", 01No. of Building(s) Ol_Wing(s) of the of the Project ( RERA Registration Number) situated on tbe Plot bearing CTS No.l697Al19/1+1697N19/2 demarcated by its boundaries (latitude and longitude of the end points) 4.50M PATIMAY to the Noth,1697N20 to the Soutb ,10.0 M WIDE ROAD to the East, BOLE -N//A-Phase to the West of Division JALGAON village JALGAON taluka JALGAON District - JALGAON, PIN 425001, admeasuring 318.60 sq mts area b€ing developed by (Promoter's Name) Sir, r.,, VWe Anand Amol Mukund have undertaken assignment as Architect/Engineer of certifoing Percentage of Completion of Construction Work of " Shree Sai Sona Pl,"a" the Building(s/-0 Wing(s) of the _0________Phase of the Project, situated on the plot bearing CTS No.l697Al19/1+1697N1912, of Division JALGAON village JALGAON taluka JALGAON District - JALGAON, PIN 425001, admeasuring 318.60 sq.mts. area being developed by N & L ASSOCIATES as per the approved plan 1 Following technical professionals are appointed by Owner/Promoter:- (as applicable) (i) Shri Arand Amol Mukund as Arcbitect/Engineer (ii) Shri Anand Amol Mukund as Structural Consultant (iii) M/s /Shri/Smt. as MEP Consultant (iv) Shri SAGAR SUBI{ASH INGALE as Site Supervisor Based on Site Inspection, with respect to each ofthe BuildingAMing ofthe aforesaid Real Estate Project, I certiry that as on the date ofthis certificate, the Percentage of Work done for each of the buildingMing of the Real Estate Project as registered vide number under RERA is as pertableAhereinbelow. ThepercentageoftheworkexecutedwithrespecttoeachoftheactivityoftheentirephaseisdetailedinTableAandB. Table - A Building "Shree Sai Sona Plaza" Percentage ofwork Sr, No Tasks/Activitv dnnc Dxcavation 10001 2 Basement(s) and Plinth 1000/ Mezzanine Floor loool First Floor lo00/\ 5 6 number of Slabs of Suoer Structure l00o/t 6 htemal walls, Intemal Plasteq Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises l00o/o 7 lanitarv Fittinss within the Flat/Premises 100% Staircases, Lifu Wells and I-obbies at each Floor level connecting Staircases and Lifts, Overhead and 8 Underground Water Tanks 90o/o The extemal plumbing and extemal plaster, elevation, completion ofterraces with waterproofing ofthe 9 BuildingAVing 10001 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing tc l0 entrance lobby/s, plinth protection, paving ofareas appurtenant to Building^Ving, Compound Wall and all other requirements as may be required to Obtain Occupation/Completion Cartificate 8001 Table - B Internal & Extemal Development Works in Respect of the entire Registered Phase )-' Proposed Percentage of Remarks \ I Sr. No Common areas and Facilities Amenities (Yes/Nlo) work done lntemal Roads & Footpaths $o ,t/A rly'ater Supply Yes lo00l 3 lewerase (chamber. lines. Seotic Tank. STP) Yes 9001 + itorm Water Drains Yes loo, 5 -andscaoins & Tree Plantins Yes {/A 6 ilreef T iohfi Yes \I/A 7 rifv Rrildinc {o ,I/A 8 l'reatment and disoosal ofsewage and sullage water /STP Vo {/A 9 lolid Waste Manasement & Disoosal {o \I/A 0 ffater Conservation- Rain Water Hawestins " Percolating Well/Pit Yes 10001 3nerw Manasement \{o \IiA 2 Fire Protection and Fire Safety Requirements \Io $/A J alectrical Meter Room. Sub-station. Receiving Station \Io \/A A Ithers footion to.hdd more) No {/A Signature & Name (IN BLOCK LETTERS) OF Architect/Engineer (License No.2l.) ANAND A.INUKUNI) M.E-(Structure'8)