FORM 1 ARCHITECT'S CERTIFICATE To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 03-07-2020 To TheN&LASSOCIATES. 56,SHIVRAM NAGARMJ COLLAGE ROAD, JALGAON Subject: Certificate of Percentage of Completion of Construction Work of " Shree Sai Sona Plaza", 01No. of Building(s) ol_Wing(s) of the of the Project ( RIRA Registration Number) situated on the Plot bearing CTS No.1697A/19/1+1697N19/2 demarcated by its boundaries (latitude and longitudo of the end points) 4.50M PATHWAY to the North ,1697A/20 to the South ,10.0 M WIDE ROAD to the East, BOLE -N//A-Phase to the West of Division JALGAON village JALGAON taluka JALGAON District - JALGAON, PIN 425001, admeasuring 318 60 sq.mts. area being developed by (Promoter's Name) Sir, VWe Anand Amol Mukund have undertaken assignment as Architect/Engineer of certifoing Percentage of Completion of Construction Work of " Shree Sai Sona Plaza" the Building(s/_0_ping(s)of the _O_Phase of the Project, situated on the plot bearing CTS No16974/19/l+1697N19/2,ofDivision JALGAONvillageJALGAONtalukaJALGAONDistrict-JALGAON,PIN42500l,admeasuring3l8.60 sq.mts. area being developed by N & L ASSOCIATES as per the approved plan. ll I Fdllowing technical professionals are appointed by Owner/Promoter:- (as applicable) I (i) Shri Anand Amol Mukund as Architect/Engineer (ii) Shri Anand Amol Mukund as Structural Consultarit (iii) Ml/s./Shri/Smt as MEP Consultant (iv) Shri SAGAR SUBIIASH INGALE as Site Supervisor Based on Site Inspection, with respect to each ofthe BuildingAMing ofthe aforesaid Roal Estate Project, I certi$ that as on the date ofthis certificate, the Percentage of Work done for each of the buildingMing of the Real Estate Project as registered vide number under RERA is as per table A herein below. The percentage ofthe work executed with respect to each ofthe activity ofthe entire phase is detailed in Table A and B Table - A Building "Shree Sai Sona Plaza" Sr. No Tasks/Activity Percentage ofwork done Excavation 10001 2 Basement(s) and Plinth 10001 3 Mezzanine Floor 10001 ^ First Floor IOOoI 5 6 number of Slabs of Suoer Structure 100% 6 Intemal walls, Intemal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 10001 7 lanitary Fittines within the Flat/Premises 5001 Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and 8 Jnderground Water Tanks 7001 Ihe external plumbing and extemal plaster, elevation, completion oftenaces with waterproofing ofthe 9 3uilding;/IVing 10004 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, compliance to conditions of environmen/CRZ NOC, Finishing to l0 entrance lobby/s, plinth protection, paving of areas appudenant to BuildingMing, Compound Wall and all other requirements as may be required to Obtain Occupation/Completion Certificate 25o/a Table - B lntemal & External Development Works in Respect of the entire Registered Phase Proposed Percentage of Sr. No Common areas and Facilities Amenities Remarks /Yes/Nn\ work done I ntemal Roads & FootDaths \To N/A 2 iy'ater Suoolv Yes loool 5 lewerase (chamber- lines- Seotic Tank- STP) fes 5001 4 ;torm Water Drains Yes loool 5 -andscaoine & Tree Plantine res .I/A 6 ifreel I Yes {/A 7 lommunitv Buildines {o {/A 8 lreatment and disoosal of sewaee and sullaee water /STP !,lo {/A 9 iolid Waste Manaeement & Disoosal {o {/A l0 JVater Conservation. Rain Water Harvestins. Percolatine Well/Pit Yes 10001 lnerw Manasement $o \I/A 2 lire Protection and Fire Safetv Reouirements $o \IiA 5 llectrical Meter Room- Sr.Nstation. Receivine Station {o \I/A 4 )thers (Ootion to Add mor {o {/A Yours Faithfully, MRA NAND AMOI MIIKIINT)