FORM 1 ARCHITECT’S CERTIFICATE To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 20/04/2020 To The N & L ASSOCIATES. 56,SHIVRAM NAGARMJ COLLAGE ROAD, JALGAON Subject: Certificate of Percentage of Completion of Construction Work of " Shree Sai Sona Plaza", 01No. of Building(s) 01_Wing(s) of the ___N//A_Phase of the Project (MAHARERA Registration Number) situated on the Plot bearing CTS No.1697A/19/1+1697A/19/2 demarcated by its boundaries (latitude and longitude of the end points) 4.50M PATHWAY to the North ,1697A/20 to the South ,10.0 M WIDE ROAD to the East, BOLE to the West of Division JALGAON village JALGAON taluka JALGAON District - JALGAON, PIN 425001, admeasuring 318.60 sq.mts. area being developed by (Promoter’s Name) Sir, I/We Anand Amol Mukund have undertaken assignment as Architect/Engineer of certifying Percentage of Completion of Construction Work of " Shree Sai Sona Plaza" the Building(s)/___0________Wing(s) of the _0___________Phase of the Project, situated on the plot bearing CTS No.1697A/19/1+1697A/19/2 , of Division JALGAON village JALGAON taluka JALGAON District - JALGAON, PIN 425001, admeasuring 318.60 sq.mts. area being developed by N & L ASSOCIATES as per the approved plan. 1. Following technical professionals are appointed by Owner/Promoter:- (as applicable) (i) Shri Anand Amol Mukund as Architect/Engineer (ii) Shri Anand Amol Mukund as Structural Consultant (iii) M/s./Shri/Smt._______________________ as MEP Consultant (iv) Shri SAGAR SUBHASH INGALE as Site Supervisor Based on Site Inspection, with respect to each of the Building/Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building/Wing of the Real Estate Project as registered vide number _______________ under GujRERA is as per table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table A and B. Table – A Building "Shree Sai Sona Plaza" Percentage of work Sr. No Tasks/Activity done 1 Excavation 100% 2 Basement(s) and Plinth 100% 3 Mezzanine Floor 100% 4 First Floor 100% 5 ____6_number of Slabs of Super Structure 100% Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the 6 Flat/Premises 40% 7 Sanitary Fittings within the Flat/Premises 0% Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and 8 Underground Water Tanks 70% The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the 9 Building/Wing 50% Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to 10 Common Areas, electro, mechanical equipment, compliance to conditions of environment/CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation/Completion Certificate 25% Table - B Internal & Extemal Development Works in Respect of the entire Registered Phase Proposed Percentage of Sr. No Common areas and Facilities Amenities (Ym/No) Remarks work done Intemal Roads & FootDaths rlo N/A Water Supply (es 0o/r J Sewerase (chamber, lines, Septic Tank, STP) Yes 5001 4 Storm Water Drains fes ool 5 Landscaping & Tree Planting fes 001 6 Street Lishtins fes oo/ 7 Communiw Buildings {o {/A 8 Ireafrnent and disDosal ofsewage and sullage water /STP {o {/A 9 Jolid Waste Manasement & Disposal {o {/A 0 rtry'ater Conservation- Rain Water Harvestine - Percolatins Well/Pit Yes 001 lnergv Management {o {/A 2 lire Protection and Fire Safety Requirements \o \I/A J llectrical Meter Room, Sub-{htion, Receiving Station No \I/A A )thers (ODtion to Add more) No \I/A Yours Faithfully, MRAN Signature & Name (IN BLOCK LETTERS) OF Architect/Engineer (License No.2l.) er -' -D A. SJ1IJ KU ND A}I.,,\FT 'nr tVl'E'(structure's) o.021 esh APt' n-425001 99499