FORM 1 ARCHITECT'S CERTIFICATE To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: t4-01-2020 To TheN&LASSOCIATES. 56,SHIVRAM NAGARMJ COLLAGE ROAD, JALGAON Subject: Certificate of Percentage of Completion of Constmction Work of " Shree Sai Sona Plaza", 0lNo. of Building(s) 0l_Wing(s) of the _N//A_Phase of the Project (Gujarat RERA Registration Number) situated on the Plot bearing CTS No 1697.4/19/l+1697N19/2 demarcated by its boundaries (latitude and longitude of the end points) 4.50M PATIIWAY to the North ,1697N2O to the South ,10.0 M WIDE ROAD to the East, BOLE to the West of Division JALGAON village JALGAON taluka JALGAON District - JALGAON, PIN 425001, admeasuring 318.60 sq.mts. area being developed by (Promoter's Name) S ir, UWe Anand Amol Mukund have undertaken assignment as Architect/Engineer of certifling Percentage of Completion of Construction Work of " Shree Sai Sona Plaza" the Building(s)/_0_!Ving(s) of the _O_!hase of the Project, situated on the plot bearing CTS No.1697d19/1+1697N19/2,ofDivision JALGAONvillageJALGAONtalukaJALGAONDistrict-JALGAON,PIN425001,admeasuring3l860 sq mts. area being developed by N & L ASSOCIATES as per the approved plan l. Following technical professionals are appointed by Owner/Promoter:- (as applicable) (i) Shri Anand Amol Mukund as Architect/Engineer (ii) Shri Anand Amol Mukund as Structural Consultant (iii) M/s /Shri/Smt as MEP Consultant (iv) Shri SAGAR SUBHASH INGALE as Site Supewisor Based on Site Inspection, with respect to each ofthe BuildingAMing ofthe aforesaid Real Estate Project, I certifo that as on the date ofthis certificate, the Percentage of Work done for each of the buildingMing of the Real Estate Project as registered vide number under GujRERA is as per table A herein below. The percentage ofthe work executed with respect to each ofthe activity ofthe entire phase is detailed in Table A and B. Table - A Building "Shree Sai Sona Plaza" Percentage of work Sr. No Tasks/Activity done I lxcavation lO0o/r 2 Basement(s) and Plinth lo00l Vlezzanine Floor 10001 A iirst Floor 700/< 5 6 number ofSlabs ofSuoer Stnrcture 10001 6 ntemal walls, lntemal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the Flat/Premises 4001 7 ianitary Fittings within the Flat/Premises 001 itaircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts, Overhead and 8 Jnderground Water Tanks 7001 The external plumbing and extemal plaster, elevation, completion oftenaces with waterproofing ofthe 9 Building/lVing 001 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, compliance to conditions of environmenUCRZ NOC, Finishing to l0 entrance lobby/s, plinth protection, paving ofareas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation/Completion Certificate 0% Table - B lntemal & Extemal Development Works in Respect of the entire Registered Phase Common areas and Facilities Amenities Signature& gneer (Liconse No