FORM 1 ARCHITECT'S CERTIFICATE To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 06-07-2019 To TheN&LASSOCIATES 56,SHIVRAM NAGARMJ COLLAGE ROAD, JALGAON Subject: Certificate of Percentage of Completion of Construction Work of " Shree Sai Sona Plaza", 01No. of Building(s) Ol_Wing(s) of the _N//A_Phase of the Project (Gujarat RERA Registration Number) situated on the Plot bearing CTS No.1697A./1911+1697N19/2 demarcated by its boundaries(latitudeandlongitudeoftheendpoints)450MPATHWAYtotheNorth,l69TN20tothe,South,l0.0MWIDEROADtotheEast,BOLE to the West of Division JALGAON village JALGAON taluka JALGAON District - JALGAON, PIN 425001, admeasuring 318 60 sq mts. area being developed by (Promoter's Name) Sir, UWe Anand Amol Mukund have undertaken assignment as Architect/Engineer of certifiing Percentage of Completion of Construction Work of " Shree Sai Sona Plaza" the Building(s)/_0 Wing(s) of the _0________ptrase of the Project, situated on the plot bearing CTS No 16974/19/1+1697N1912, of Division JALGAON village JALGAON taluka JALGAON District - JALGAON, PIN 425001, admeasuring 318.60 sq mts. area being developed by N & L ASSOCIATES as per the approved plan. l. Following technical professionals are appointed by Owner/Promoter:- (as applicable) (i) Shri Anand Amol Mukund as Architect/Engineer (ii) Shri Anand Amol Mukund as Sfructural Consultant (iii) M/s./Shri/Smt as MEP Consultant (iv) Shri SAGAR SUBIIASH INGALE as Site Supervisor Based on Site Inspection, with respect to each ofthe Building/Wing ofthe aforesaid Real Estate Project, I certif that as on the date ofthis certifrcate, the Percentage ofWork done for each ofthe building/lVing ofthe Real Estate Project as registered vide number under GujRERA is as per table A herein below The percentage ofthe work executed with respect to each ofthe activity ofthe entire phase is detailed in Table A and B. Table-A Buildine "Shree Sai Sona Plaza Sr. No Tasks/Activity Pergltage"of work Excavation 10001 2 Basement(s) and Plinth 7501 j Mezzanine Floor 2501 4 First Floor 001 5 6 number ofSlabs ofSuper Structure 001 6 Intemal walls, Intemal Plaster, Floorings within Flats/Premises, Doors and Windows to eachtithe Flat/Premises 001 7 Sanitarv Fittinss within the Flat/Premises 001 Staircases. Lifts Wells and Lobbies at each Floor level connecting Staircases and Lifts. Overhead and 8 Underground Water Tanks lool o The extemal plumbing and extemal plaster, elevation, completion oftenaces with waterproofing ofthe BuildingMing 001 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, compliance to conditions of environmenVCRZ NOC, Finishing to t0 entrance lobby/s, plinth protection, paving ofareas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation/Completion Certificate ool Table - B Internal & External Development Works in Respect ofthe entire Registered Phase Proposed Percentage of Sr. No Common areas and Facilities Amenities Remarks /Ym/No\ work done I htemal Roads & Footoaths \o N/A 2 ilater SuDolv fes ool J /chamher lines Sentic Tank STP\ Yes 5001 4 itorm Water Drains Ies 001 5 -andscaoins & Tree Plantine Yes 001 6 itreet T Yes 001 7 lommrrnifv Rrildinqs {o {/A 8 freatrnent and disoosal ofsewase and sullaee water /STP {o {/A 9 lolid Waste Manasement & Disoosal {o {/A 0 ffater Conservation. Rain Water Hawestins. Percolatine Well/Pit Yes 001 1 lnerw Management $o {/A 2 lire Protection and Fire Safetv Reouirements {o {/A J llectrical Meter Roomr Sub-station- Receivine Station {o {/A 4 )thers (Obtion to Add fuore) \TO {/A Yours Faithfully, MRANAND AMOL MUKIJND t