T & C Associates KISHOR CHOPADE Reg no CA/94117554. ffi A.S,E+CIATES Architect & Interior Designer. 1-1, "Ramdas colony", M.J. College Road, Jalgaon. Ph No z-0257 /2238745 FORM L [see Regulaion 3] ARCHITECT'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-BuildingAVing wise) Date:20/0112023 To, SNEHA DEVELOPERS Partner L.Sarita Kishor Borole 2 Neha Chagan Chaudhari. Subject : Certificate of Percentage of Completion of Construction Work of SNEHA HEIGHTS Buiiding(s)/A and commercial part of B.Wing(s) phase 1 of the L...Building/Phase 1 of the Project situated on the Plot bearing C.N.No./CTS No./Survey No./Final Plot NO Plot No.3+4+5 S.No.78, PIMPRALA Shivar, Tal & Dist. Jalgaon. demarcated by its boundaries 2L.0029t573,75.54476147 ro 2I.00334029,75.5448446 30 Meter road to East, 21.0033866I,75.54455681 to 2L.00299974,75.54442002 plot no. 6, 7, B to West, 21-.0033866L,75.54455681 to 2L.00334029,75.5448446 PIot No. 2 to North, 21.00291573,75.54476t47 to 2t.00299974,75.54442002 Adjoining Gat No. 77 to South, Village Jaigaon, Taluka Jalgaon, District Jalgaon PIN-425001Division Pimpraia village taluka Jalgaon District Jalgaon. PIN425001" admeasuring 1439.37sq.mts. area being developed by SNEHA DEVELOPERS Partner l.Sarita Kishor Borole 2 Neha Chagan Chaudhari. Sir, IAN'e Kishor M. Chopade have undertaken assignment as Architect/Licensed Surveyor of certifying Percentage of Completion of Construction Work of the A and commercial part of B.Wing(s) phase 1of the 1...... .....Building/Phase 1of the Project situated on the Plot bearin[ C.N.No.lCfS No./Survey No./Final Plot No Plot NO Plot No.3+4+5 S.No.7B, PIMPRALA Shivat Thl & Dist. Jalgaon. PIN425001 admeasuring 1439.37 -sq.mts. area being developed by L.Sarita Kishor Borole 2 Neha Chagan Chaudhari. 1. Following technical professionals are appointed by Owner / Promoter : - (i) (IM/s/Shri/Smt Kishor M. Chopade as L.S./Architect; (ii) M/s.Shri./Smt Ujval R. Chaudhari as Structural Consultant (iii) M/s.Shri./Smt.... ... as MEP Consultant (iv) M/s.Shri./Smt Kishor Borole as Site Supervisor Based on Site Inspection, with respect to each of the building / Wing of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the buildingMing of the Real Estate Project as registered vide Number P49900018214 under RERA is as per table A herein below. The percentage of the work executed with respect to each of the major activity of the building / Wing and Overall Percentage of work done with respect to each BuildingMing is detailed in the Table B. Yours Faithfully KISHORTft CHOPADE Signature & Name (IN BLOCK LETTERS) of L.S./Architect ( License NO CA/941L7554.) Encl : Separate Shit Attached Table A & B ' Table A Building / Wing Number 1 (to be prepared separately for each Buildingru'ing of the project) Sr.No Tasks / Activity 50 Percentage of work done 1. Excavation 100% 2. .1........ number of Basement(s) and plinth t00%;o 3. number of Podiums 4. Stilt Floor 700o/o 5. .4...... number of Slabs of Super Structure 700% 6. Internal walls, Internal Plaster, Floorings within Flats/ 0600/o Premises, Doors and Windows to each of the Flat/premises 7. Sanitary Fittings within the Flats/Premises, 10)Yo Electrical Fittings within the Flats/Premises 8. Staircases, Lifts Wells and Lobbies at each Floor L00o/o LIFT Level connecting Staircases and Lifts, Overhead And Underground Water Tanks. 9. The external plumbing and external plaster, I00o/o Elevation, completion of teruaces with waterproofing of the BuildingAVing. 10. Installation of Lifts, water pumps, Fire Fighting Fittings o/o & Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment , Compliance to conditions of environment ICRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to Obtain Occupation / Completion Certificate. f,i). i 1,, Yours Faithfully KISHOR M. CHOPADE. Signature & Namd(IN BLOCK I,ETTERS) of L.s.larchitect ( License NO......,,...:...... ......) ::" : TABLE _ B Internal & External Development Works in Respect of the entire Registered Phase S.No. Common areas and Proposed Percentage of Details Facilities, Amenities (Yes/No) Work done L. Inteinal Roads No 0o/o Foothpaths Water Supply yes 0o/o Sewarage (chamber, Lines, Septic Tank, STP) Yes 0o/o Storm Water Drains No Landscaping & Tree YES (TREES)100% Planting 6. Street Lighting No 7. Community Buildings No B. Treatment & disposal No Of sewage and sullage Water 9. Solid Waste management No & Disposal 10. Water conservation, Rain YES ljlVo Water harvesting L1-. Energy management NO 1"2. Fire protection and fire NO Safety requirements 13. Electrical Meter Room, NO Sub-station, receiving station. l-4. Others (Option to Add more) NO Yours f S [1-,,n,sff''fi'*.' it';:,*T,tJHHXAHfi%,.M