FORM 1 [see Regulation 3] ARCHITECT'S CERTIFICATE Date: 26t07t2017 To, The SHREE DEVELOPERS 77, Lakshya, Kavyaratnawali Chowk, Jay Nagar, Jalgaon-425002. Subject : Certificate of Percentage of Completion of Construction Work of the project 'SHRISHRi LAKE CASTLE' No. of Buildings 1, Wings 3 of the Project [MahaRERA Registration Numberl situated on the Plot no. 161 Mehrun Survey No.413 having its boundaries Plot no. 101 to the North, Survey No. 409 to the South, 18 Mtr wide DP road to the East, Survey no 411to the West of village Mehrun taluka Jalgaon DistrictJalgoan PIN 425002 admeasuring 1886.19 sq.mts. area being developed by SHREE DEVELOPERS. Sir, _ l, Milind Rathi have undertaken assignment a-s Architect /Licensed Engineer of certifying Percentage of Completion of Construction Work of the above mentioned woik. 1. Following technical professionals are appointed by Owner / Promoter :- 0) Shri Milind Rathi as Licensed Engineer/Architect; (tt) Shri Milind Rathi as StructuralConsultant Based on Site lnspection, with respect to each of the BuildingAlVing of the aforesaid Real Estate Project , I certify that as on the date of this certificate, the Percentage of Work done for each of the buildingA/Ving of the Real Estate Project is as per table A herein below. percentage of the work executed with respect to each of the activity of the entire detailed in Table B. 125145'1 TABLE-A Building No. 01 / Wings A to C Excavation l-1oo- X number of Basement(s) and Plinth '....'...... I 1oo X number of Podiums i:*- Stilt Floor I 100 X number of Slabs of Super Structure niffi- O6 Internalwalls, Internal Plaster, Floorings within Flats/Premises, Doors and Windows to each of the FlaUPremises i-loo- Sanitary Fittings within the Flat/Premises,Electrical Fittings within the FlaUPremises frL tr!@ Staircases, Lifts Wells and Lobbies at each Floor level connecting Staircases and 100 n Lifts, Overhead and Underground Water Tanks. The external plumbing and external plaster, elevation, completion of terraces with waterproofing of the BuildingANing f loo- 10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings to Common Areas, electro, mechanical equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to BuildingM/ing, Compound Wall and all other requirements as may be required to Obtain Occupation /Completion Certificate t TABLE.B Internal and External Development Works in respect of the entire Registered Phase. Internal Roads & Footpaths : N Nro :J Water Supply : ,"o J i corvrRETED Sewerage (Chamber, Lines, Septic Tank , STP) : $"o Jl '=" floo"- Storm Water Drains : I r.ro ;.il Landscaping & Tree Planting : ito :J r, *"t Lishtins : Iro :"I f--o Electrical Meter Room, Sub-Station, Receiving Station : I Nro J {--i-- Aggregate area of recreational Open Space : iNo -* n-- Open Parking : lNo :j |-o Community Buildings : g Nro J ry Treatment And Disposal Of Sewage And Sullage Water: NNO :i fo- Solid Waste Management And Disposal : ,-, $ruo I '-'0 z frter Conservation, Rain water Harvesting : l"o ;j I ?0 l " -** Energy management: l'uo t Fire Protection And Fire Safety Requirements : { Nro J l-o l,#t