FORM-2 [See Regulation 3] ENGINEER’S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account- Project wise) Date : 18/07/2017 To, Shree N T Mundada Park, Mundada Market, Opp. Bus Stand, Amalner - 425 401 Subject : Certificate of Cost Incurred for Development of Shree N T Mundada Park for Construction of BUILDING NO.1 (TYPE A/Wing A) ( MahaRERA Registration Number) situated on the Plot bearing C.N. No./CTS No./Survey No./ Final Plot No. G.NO 1467+1468, F.P. NO 149 demarcated by its boundaries (latitude and longitude of the end points) Adj. F.P. 153 to the North , Adj. OLD DHULE ROAD to the South, 9M WIDE ROAD to the East, F.P. 150 to the West of Division NASIK , Village AMALNER , Taluka AMALNER District JALGAON PIN 425401 admeasuring 8689.78 sq.mts. area being developed by SHREE N T MUNDADA PARK. Ref : MahaRERA Registration Number Applied Sir, I/ We MR. CHETAN ATTAL have undertaken assignment of certifying Estimated Cost for the Subject Real Estate Project proposed to be registered under MahaRERA, being BUILDING NO.1 (TYPE A/Wing A) situated on the plot bearing C.N. No./CTS No./Survey No./ Final Plot No. G.NO 1467+1468, F.P. NO 149 of Division NASIK Village AMALNER Taluka AMALNER District JALGAON PIN 425401 admeasuring 8689.78 sq.mts. area being developed by Shree N T Mundada Park 1. Following technical professionals are appointed by Owner / Promoter :–– (i) Shri Sanjay Pabari as Architect ; (ii) Shri Milind Rathi as Structural Consultant (iii) Shri Chetan Attal as Quantity Surveyor * 2. We have estimated the cost of the completion to obtain Occupation Certificate/ Completion Certificate, of the Civil, MEP and Allied works, of the Building(s) of the project. Our estimated cost calculations are based on the Drawings/plans made available to us for the project under reference by the Developer and Consultants and the Schedule of items and quantity for the entire work as calculated by Shri Chetan Attal quantity Surveyor* appointed by Developer/Engineer, and the assumption of the cost of material, labour and other inputs made by developer, and the site inspection carried out by us. 3. We estimate Total Estimated Cost of completion of the building(s) of the aforesaid project under reference as Rs.7,00,00,000/- (Total of Table A and B). The estimated Total Cost of project is with reference to the Civil, MEP and allied works required to be completed for the purpose of obtaining occupation certificate / completion certificate for the building(s) from the Nagar Palika, Amalner being the Planning Authority under whose jurisdiction the aforesaid project is being implemented. 4. The Estimated Cost Incurred till date is calculated at Rs. 1,56,25,000/- (Total of Table A and B). The amount of Estimated Cost Incurred is calculated on the base of amount of Total Estimated Cost. 5. The Balance cost of Completion of the Civil, MEP and Allied works of the Building(s) of the subject project to obtain Occupation Certificate / Completion Certificate from Nagar Palika, Amalner (planning Authority) is estimated at 5,43,75,000/- ( Total of Table A and B). 6. I certify that the Cost of the Civil, MEP and allied work for the aforesaid Project as completed on the date of this certificate is as given in Table A and B below : TABLE A Building /Wing bearing Number 1 or called Wing A Type A (to be prepared separately for each Building /Wing of the Real Estate Project) Sr No. Particulars Amounts (1) (2) (3) 1. Total Estimated cost of the building/wing as Rs. 6,25,00,000/- on 18.07.2017 date of Registration is 2. Cost incurred as on 18/07/2017(based on the Rs. 1,56,25,000/- Estimated cost) 3. Work done in Percentage (as Percentage of 25% the estimated cost) 4. Balance Cost to be Incurred (Based on Rs. 6,25,00000/- Estimated Cost) 5. Cost Incurred on Additional /Extra Items as Nil on 18/07/2017 not included in the Estimated Cost (Annexure A) TABLE B (to be prepared for the entire registered phase of the Real Estate Project) Sr No. Particulars Amounts (1) (2) (3) 1. Total Estimated cost of the Internal and Rs.75,00,000/- External Development Works including amenities and Facilities in the layout as on 18/07/2017 date of Registration is 2. Cost incurred as on 18/07/2017 (based on the Rs.0 Estimated cost). 3. Work done in Percentage (as Percentage of 0% the estimated cost).