I Pratik Prakash Badgujar 9 Dhule 111 badgujar.pratik@gmail.com □ 8087999987 AnnexureA FORM 1 [see Regulation 3) ARCHITEcrs CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account) Date: 30.06.2026 To, CHAUDHARI AND BADGUJAR ASSOCIATES DHULE, MAHARASHTRA, 424002 Subject : Certificate of percentage of Work of completion of construction work of Narayani Apartment having MahaRERA Registration Number P49800080221 (Only Applicable after project Registartion) being developed by CHAUDHARI AND BADGUJAR ASSOCIATES Sir, IN/e PRATIK BADGUJAR have undertaken assignment as Architect /Licensed Surveyor of certifying Percentage of completion of Construction Work of Narayani Apartment having MahaRERA Registration Number P49800080221 (Only Applicable after project Registration, being developed by CHAUDHARI AND BADGUJAR ASSOCIATES) Based on Site Inspection.with respect to Layout/ each of the BuildingNling of the aforesaid Real Estate Project I certify that as on the date of this certificate. the Percentage of Work done for each of the building/Wing of the Real Estate Project under MahaRERA is as per Table A herein below. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A Layout/Building/Wing Number: Residential Building-Narayani Apartment/NA Sr. No. Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) (1) (2) (3) 1 Excavation 100.00 2 Basements (if any) 0.00 3 Podiums (if any) 0.00 4 Plinth 0.00 5 Stilt Floor 0.00 6 Slabs of Suner Structure 100.00 7 Internal walls, Internal plaster, Floorings, Floors and windows within 100.00 Flats/Premises A - ·-- CiH,r1r. Lu:u... : .... th .... c1..,,· 1- ar:nn - Paoe 1 ofJ - Sr. No. - Tasks/Activity Percentage of Actual Work Done (As on date of the Certificate) L-- - Staircases. lifts Wells and Lobbies at each Floor level Overhead and 9 95.00 .!!!!~round Water Tonks ,_, 10 External plumbing and external plaster, elevation, completion of terraces with 95.00 wateroroofina of the Buildlna/wina. 1-• 11 Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per 0.00 CFO NOC, Electrical fittin~s, mechanical equipment, compliance to conditions of envlronment/CRZ NOC, F nishl~ to entrance lob~/s, plinth protectlon,paving of areas appurtenant to Buildlng/Wrng, Compound all and all other requirements as may be required to complete project as per specifications In agreement of Sale. Any other activities. Page 2 of 3 External Development w k8 ) 1n respect of Registered Table B - Common Areas (Internal and or Phase / Project Number) Sr.No Common areas and facllltles Is Avallable Percentage of Actual Details (Yes/ No) Work Done (As on date of the Certificate) (2) (3) (4) (5) (1) No 0.00 NA 1 Internal Roads & Footoaths Yes 0.00 NA 2 Water Suoolv STP) No 0.00 NA 3 Seweraoe (Chamber Lines Septic Tank No 0.00 NA 4 Storm Water Drains NA No 0.00 5 Landscaoino & Tree Plantino NA No 0.00 6 Street Lightino NA No 0.00 7 Community Buildinos NA e Water No 0.00 8 Treatment And Disoosal Of Sewaoe And Sullag NA sal No 0.00 9 Solid Waste Manaoement And Dlsoo 0.00 NA Yes 10 Water conservation /Rain water harvestino 0.00 NA No 11 EnerQv management 0.00 NA No 12 Fire protection and fire safetv reauirements 0.00 NA No 13 Electrical meter room sub-station receiving station 0.00 NA No 14 Aqgregate area of recreational Open Space 0.00 NA Yes 15 Open Parkina Yours Faithfully A PRATIK BADGUJAR y Signature & Name (IN BLOCK LETTERS) of LS/ Architect ( License No: R/2023/APU08037) Date of Certificate: Agreed and accepted by: Signature of Promoter s As O Name: Chaudhari and Badgujar Associate Date: 30.06.2026 Chaudhari & eadgu}ar s. t Partna'r Page 3 ofJ