ARCHITECT'S CERTIFICATE Date: 29/08/2017 To The Parakh Plexus Realty Ltd, Pune Subject : Certificate of Percentage of Completion of Construction Work of M1 Building of the PPRL Mera Ghar, Jalgaon situated on the Final Plot no 54+55+56+57+101+102+103/1 of G.No. 284/1+2/1+2/2+2/3+2/4+2/5+2/6 demarcated by its boundaries Plot No. 58 & Plot No. 100 Road to the North, G. No. 283 to the South, 9 M Road to the East, 24 M D. P. Road to the West of village Pimprala Shiwar, Taluka Jalgaon, District Jalgaon, PIN 425001 admeasuring 976.14 sq.mts. area being developed by Parakh Plexus Realty Ltd. Sir, I, Ar. Hitesh Parakh have undertaken assignment as Architect of certifying Percentage of Completion of Construction Work of the M1 Building of the Project, situated on the Final Plot No. 54+55+56+57+101+102+103/1 of G.No. 284/1+2/1+2/2+2/3+2/4+2/5+2/6 of village Pimprala Shiwar, Taluka Jalgaon, District Jalgaon, PIN 425001 admeasuring 976.14 sq.mts. area being developed by Parakh Plexus Realty Ltd. 1. Following technical professionals are appointed by Owner / Promoter :- (i) Shri Hitesh V. Parakh as Architect ; (ii) M/s R. G. Birla & Associates as Structural Consultant Based on Site Inspection, with respect to each of the Building of the aforesaid Real Estate Project, I certify that as on the date of this certificate, the Percentage of Work done for each of the building. The percentage of the work executed with respect to each of the activity of the entire phase is detailed in Table B. Table A M1 Building, PPRL Mera Ghar, Jalgaon Sr. No Tasks /Activity Percentage of work done 1 Excavation 100 2 1 number of Plinth 100 3 0 number of Podiums n.a. 4 Stilt Floor 100 5 8 number of Slabs of Super Structure 80 6 Internal walls, Internal Plaster, Floorings within 53 Flats/Premises, Doors and Windows to each of the Flat/Premises 7 Sanitary Fittings within the Flat/Premises, Electrical 17 Fittings within the Flat/Premises 8 Staircases, Lifts Wells and Lobbies at each Floor level 20 connecting Staircases and Lifts, Overhead and Underground Water Tanks 9 The external plumbing and external plaster, elevation, 0 completion of terraces with waterproofing of the Building/Wing, 10 Installation of Lifts, Water Pumps, Fire Fighting Fittings 0 and Equipment as per CFO NOC, Electrical Fittings to Common areas, Electro, Mechanical Equipment, Compliance to conditions of environment /CRZ NOC, Finishing to entrance lobby/s, plinth protection, paving of areas appurtenant to Building, Compound Wall and all other requirements as may be required to obtain Occupation Certificate/ Completion Certificate. TABLE-B M1 Building, PPRL Mera Ghar, Jalgaon S.No Common areas Proposed Percentage of Details and Facilities, (Yes/No) Work done Amenities 1. Internal Roads & N N.A. Foothpaths 2. Water Supply Y 100 Bore Well Done 3. Sewarage (chamber, lines, Y 50 It will be done Septic Tank , STP) 4. Storm Water Y 40 It will be done Drains 5. Landscaping & Y 100 Tree Planting Completed 6. Street Lighting N N.A. 7. Community Buildings N N.A. 8. Treatment and disposal of sewage and N N.A. sullage water Solid Waste Management & 9. Disposal N N.A. Water conservation, Rain 10. water harvesting Y 15 In Progress Energy 11. management N N.A. Fire protection and fire safety 12. requirements Y 00 Electrical meter room, sub-station, receiving station 13. Y 10 In Progress Yours Faithfully, Ar. Hitesh Parakh CA/2016/79282