TUSHAR D. BHOLE B.E. Civil 147, Jilha Peth, Front of J.M.P. Market, Jalgaon. Ph.: (0257) 2228691, Mob.: 9422235520 Ref. No. Date :Os / oS I 2013 FORM 2 (See Regular 3) ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money from Designated Account-Project wise) To, Minakshi Construction (SIDDHIVINAYAK HEIGHTS), Partnerl) Hitendra Shankar Patil, 2) Yamini Ajit Borole. Subiect :- Certificate of Cost incurred for Development of (Project Name) for Construction of SIDDHI\TINAYAK HEIGHTS. Building(s)....1.... Wings(s) of the 1... Building/Phase of the Project situated on the plot bearing C.No.No./CTSNo./Survey No./ F inal Plot No. 8+9, G.No. I92, Pimprala, Jalgaon, demarcated by its boundaries 2l .01070, 7 5.541716 to 21.010658,75.541226 Road to the North 21.010548, 75.541288 to 21.010451, 7 5.4117 51 Road and Plot No. 10 to the South 21.01045 1 , 75.541751to2t.01070,75.541276P1otNo.7, to the Eastto the West of Divi- sion Pimprala, Village Jalgaon Taluka Jalgaon District Jalgaon Pin-425001 admeasuring 891 .85 Sq.Mtrs. Area being development by Minakshi Construc- tion (SIDDHIVINAYAK HEIGHTS) Partndr 1) Hitendra Shankar Patil,2) Yamini Ajit Borole. Ref : RERA Registration Number P49900000600 Sir, I/we TUSHAR BHOLE have undertaken assignment of certi$zing Estimated Cost for the Subject Real Estate Project proposed to be registered under RERA, being.n*,.*rs,:h.:..:.:.':"i::.Building(s)i......1...wing(s)ofthe 1.................puiIding/ phase ofthe project situated on the plot bearing C.No.No./CTS No./Survey No./ I Final plot No.8+9, G.No . lgl,Pimprata, Jalgaon Village Jalgaon Taluka Jalgaon, District Jalgaon pIN 425001 admeasuring 891 .85 sq.mtrs..ar.eateing dev.eioped , 1. Hilend{? by Minakshi construetion (SIDDHIVINAYAK HEIGHTP liOo:r Shankar Patii, 2) Yamini Ajit Borole .*^lo ,;''. '.'" " ,' , '.:' " i "' " '' . " Z. Following technical professionals are appoiuted by Owner/Promoter l-, ;", r. (v) Iws/shri/smt.I(ishor M.chopade as L.s./Architect; , . : (vi) Ivfl s/Shri/S mt.Uj val R. Chaudhari as Structural C onsultant ; (vii) IlUs/Shri/Smt as MRP Consultant; (viii)ivTsiSlri/Sm1........ ......,asQuantitySurveyor; 1. We have estimated to the cost of the completion to obtain Occupation CertificateiComptection Certificate, of the eivil, MEP and Allied works, bf tn* buildings (s) of the Project. Our estimated cost calculations arQ based"on the Drawings/plans Made available to qs for the project under.lreferenco'by the: made by developer, and the site inspection carried out by us. Z, Wc estimate total eost of completion of the building(s) of the aforesaid ! proje*t. Underreference as Rs.3,26,00,0001-. The estimated total eost of projeet is with referenee to ttre Civaii, MEF. and allied works requireel to be eomplet3d fot the purpose of obtaining to oceupation certificate/completion certificate for the building(s) from the JALGAON NI\INICIFAL CORSOI{NION, ]AL,GAON is, bearing the planningAuthoriry under wheisejurisdiefir:n tlie 4{orcsaid'}ro.1'eet TUSHAR Di BHOLE, h# B.E. Chdl . tf7,lilha Peth,falgaon I being implemented. The I 3. The Esitmated Cost incurred till date is calculated at Rs.3,14,00,000/-' amount of Estimated cost incurred is calculated on the base of amount of rotal Estimated Cost. The balance cost of completion of the civil, MEP and allied works of the I 4. certificate/comple- buildings(s) of the subject of project to obtain occupation JALGAON (plan- tion certificate JALGAoN MLTNICIPAL coRpoRATIoN, I ning authority) is estimated atRs' 00/- aforesaid 5. I certiff that the cost of the Civil, MEP and allied works for the project as completed on the date of this certifi'cate is as given in Table A and B below. TABLE A HEIGHTS' Building/wing beaing Number ....1.... or called SIDDHIVINAYAK Particulars Amount Sr. No. Rs.3,26,00,000.00 1. Total Estimated cost of the building/ wing as on 30.09 '2019 date of registration is Rs.3,14,00,000.00 2. Cost incurred as on 30'09'2019 (base on the Estimated Cost) r00% 3. Work done in percentage (as Percentage of the estimated cost) N.A. 4. Balance cost to be incurred (based on the Estimated Cost) N.A. 5. Cost incurred on AdditionallExtra Items As on 30.09.2019' Not included in the Estimated Cost'(Annexure A) TUSHAR D. BHOIT B.B. CMI 147,lilha Pe&ldgaon