TU$F|AR D" BHOLH B.E. Civil 147, Jilha Peth, Front of J.M.P. Market, Jalgaon Ph.: (0257) 2228691, M-ob.: 942223552A Ref. No. Date:20lo3l2O1B FORM 2 (See Regular 3) ENGINEER'S CERTIFICATE (To be submitted at the time of Registration of Ongoing Project and for withdrawal of Money f,rom Designated Account - Project wise) To, Minakshi Construction (SIDDHIVINAYAK HEIGHTS), Parher 1) Hitendra Shankar Patil, 2) Yamini Ajit Borole. Subject :- Certificate of Cost incurred for Development of (Project Name) for Construction of SIDDHIVINAYAK HEIGHTS) Building(s)....1..... Wings (s) of thetl....... BuildinglPhaie of the Project situated on the plot bearing C.No.No.iCTS No./Survey No./Final Plot No. 8+9, G.No. 192, Pimprala, Jalgaon, demaicated by its boundaries 21 .01070, 7 5.541716 to 2l .01065 8, 7 5 .5 41226 Road to the North 2l .0 10548, 7 5 .5 41 28 8 to' 2L 0 1 045 1, 7 5 .4117 slroad and plot No. 10 to the South 2l .Ol045l ,7 5 .5417 5l to 21 .0 I 070, I5 .54127 6P1ot No. 7 ,to theEst to the West of Division Pimprala, Village Jalgaon Taluka Jalgaon District Jalgaon PIN-425001 admeasuring 891.85 sq.mtrs. area being developent by Minakshi Construction (SIDDHIVINAYAK I{EIGTS) Partner 1) Hitendra Shankar Patil, 2)Yamini Ajit Borole. Ref : RERA Registration Number P49900000600 Sir, . I/We TUSHAR BHOLE have undertaken assignment of certiffing Estimated B. E. Civit 1 47, Jtlha Peth, Ja lgaon project proposed to be registered under RERA, cost for the Subject Real Estate being Building(s)/......1...Wing(s)ofthe1""""""""'Building/ phase ofthe project situated on the plot bearing c.No.No./crS No./Survey No.i FinalPlotNo.8+g,G.No.lg\,Pimprala,JalgaonVillageJalgaonTalukaJalgaon gg 1 .g5 sq.mtrs. area being developed District Jalgaon pIN 425001 admeasuring TmIGHTS) Partner 1"' Hitendra by Minakshi construction (SIDDHIVINAYAK Shankar Patil, 2) Yamini Ajit Borole by ownerlPromoter :- 2. Following technical professionals are appointed (v) M/s/Shri/Smt.Kishor M. Chopade as L. S .iArchitect; as Structural C onsul tant; (v i) \zusi Shri/ S mt.uj val R. Chaudhari as MRP Consultant; (vii) IWs/Shri/Smt as Quantity Surveyor; (viii) \4/s/Shri/Smt....... 1. we have estimated to the cost of the completion to obtain occupation MEP andAllied works' of the certificate/complection certificate, of the civil, project. our estimated cost calculations are based on the buildings (s) of the project under reference by the Drawings/plans Made available to us for the of items and quantrty for the entire Developer and consultants and the schedule work as calculated by quantity surveyor appointed by made by developer, and the assumption of the cost of materiar, labour and other inputs carried out by us' made by developer, and the site inspection We estimate total cost of completion of the building(s) of the aforesaid Z. project. total cost of project is Under reference as Rs.3,26,00,000/-. Tire estimated works required to be completed for with reference to the civail, MEp and allied to occupation certificate/compretion certificate for the the purpose of obtaining CORPORATION' JALGAON building(s) from the JALGAON MI-INICIPAL pranning Authority under whose jurisdiction the aforesaid project is bearing the TUSHAR D. BHOLE B. E. Civil 1 47,.\ilha Peth, Ja g ao n I being implemented. The Estimated Cost incurred till date is calculated at Rs' 2,12,00,000/-' 3. on the base of amount of The amount of Estimated cost incurred is calculated Total Estimated Cost. and allied works of the 4. The balance cost of completionof the civil, MEP certificateicompletion building(s) of the subject project to obtain occupation JALGAON (planning Certificate JALGAON MLINICIPAL CORPORATION' authority) is estim ated atRs' 1, 1 4,00,000/- 5. I certiff that the cost of the civil, MEP and allied works for the aforesaid given in Table A and B project as completed on the date of this certificate is as below. TABLEA . ........""' Building/wing bearingNumber 1 .............. or called Real Estate Project) (To be prepared separately for each building/wing of the Amount No. Sr. Particulars Rs. 3,26,00,000.00 1. Total Estimated cost of the building/ wing as on ""date of reigstration is 2. cost incurred as on 31.03.2018 (based onthe Rs.2,12,00,000 Estimated Cost) , 3.Workdoneinpercerrtage(asPercentageoftheRs.65% estimated cost) 4, Balance cost to be incurred (based on the Rs.1,14,00,000 Estimated Cost) 5.CostincurredonAdditionallExtraltemsAsRS.00.00 on . . . . .. . Not included in the Estimated Cost (Annexure A) TUSHAI? N. B}{OLE B" E. Clvil 1 47,Jilha Peth,Jalgaon